Shiv Paradise

by Shiv Corporation Partnership
Certificate SignedP51700046607
Shiv ParadiseProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700046607
Registration No.
REA51700117723
Registration Date
2024-05-06
Developer
Shiv Corporation Partnership
Architect
SAMARTHYA ENGINEERS
Project Bank
HDFC BANK
Proposed Possession
2025-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
102
Units Sold
80 (78%)
Buildings
2
Project Area
1671.89 sq.m
Total FSI
4543.00
Approved FSI
4543.00
MahaRERA QR
Shiv Paradise
MahaRERA — P51700046607
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
✅Sanctioned9
🏠Habitable7
🔢Total Units53
🏡Residential53
🏗️Proposed Floors9
✅Sanctioned9
🏠Habitable7
🔢Total Units49
🏡Residential49

Apartment Configurations

Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK23.64101
0%
1BHK29.9523149
61%
1BHK32.11770
100%
1BHK33.57871
88%
2BHK45.86734
43%
2BHK46.06734
43%

Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK26.511468
43%
1BHK29.64761
86%
1BHK32.41459
36%
1BHK32.98716
14%
1BHK34.18707
0%

Construction Progress

Wing A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

Wing B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
✅Community Buildings100%
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting100%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting100%