SHIV SHAKTI COMPLEXProject photos will appear here when available.
Project Information
RERA Certificate No.
P52000048777
Registration No.
REA52000114645
Registration Date
2025-08-01
Developer
Shiv Shakti Developers Partnership
Architect
AAYADI ARCHITECTS & PLANNERS
Project Bank
IDBI BANK
Proposed Possession
2029-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
235
Units Sold
43 (18%)
Buildings
5
Project Area
6300.00 sq.m
Total FSI
9395.76
Approved FSI
9395.76
SHIV SHAKTI COMPLEX MahaRERA — P52000048777
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable6
🔢Total
Units48
🏡Residential48
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable6
🔢Total
Units48
🏡Residential48
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable6
🔢Total
Units54
🏡Residential54
🏗️Proposed Floors7
✅Sanctioned7
🏠Habitable5
🔢Total
Units50
🏡Residential50
🏗️Proposed Floors7
✅Sanctioned7
🏠Habitable5
🔢Total
Units35
🏡Residential35
Apartment Configurations
BUILDING NO 1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
31.92
12
0
12
0%
1BHK
32.44
12
0
12
0%
1BHK
32.58
12
0
12
0%
BUILDING NO 2, A WING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
33.11
6
0
6
0%
1BHK
33.16
6
0
6
0%
1BHK
33.56
6
0
6
0%
1BHK
33.67
6
0
6
0%
1BHK
33.77
12
0
12
0%
1BHK
34.05
6
0
6
0%
1RK
21.88
6
0
6
0%
BUILDING NO 2, B WING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
33.11
6
0
6
0%
1BHK
33.16
6
0
6
0%
1BHK
33.46
6
0
6
0%
1BHK
33.56
6
0
6
0%
1BHK
33.65
6
0
6
0%
1BHK
33.67
12
0
12
0%
1BHK
33.77
6
0
6
0%
1RK
21.88
6
2
4
33%
BUILDING NO 3, A WING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
29.61
5
0
5
0%
1BHK
30.11
5
0
5
0%
1BHK
30.14
5
0
5
0%
1BHK
30.41
5
0
5
0%
1BHK
30.55
5
0
5
0%
1BHK
31.77
5
0
5
0%
1BHK
32.0
5
0
5
0%
1BHK
32.04
5
0
5
0%
2BHK
41.55
5
3
2
60%
2BHK
45.98
5
0
5
0%
BUILDING NO 3, B WING
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
26.77
5
1
4
20%
1BHK
31.26
5
2
3
40%
1BHK
32.03
5
0
5
0%
1BHK
32.08
5
0
5
0%
1BHK
32.48
5
0
5
0%
1BHK
35.06
5
1
4
20%
2BHK
41.27
5
1
4
20%
Construction Progress
BUILDING NO 1
Basement (if any)0%
Excavation20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%
BUILDING NO 2, A WING
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks23%
Stilt Floor80%
BUILDING NO 2, B WING
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks23%
Stilt Floor80%
BUILDING NO 3, A WING
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor80%
BUILDING NO 3, B WING
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor80%
RERA Registered Amenities
✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting30%
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)30%
⬜Solid Waste Management And Disposal
⬜Storm Water Drains
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water