Shiv Shanti Residency

by Shree Guruji Infra Partnership
Certificate SignedP99000020975
Shiv Shanti ResidencyProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000020975
Registration No.
REA99000056648
Registration Date
2022-06-29
Developer
Shree Guruji Infra Partnership
Architect
GAURESH P NAVALKAR
Project Bank
AXIS BANK
Proposed Possession
2029-02-28
Revised Possession
1900-01-01
Extended Possession
2028-10-31
Total Units
130
Units Sold
48 (37%)
Buildings
5
Project Area
2500.00 sq.m
Total FSI
7998.86
Approved FSI
5887.76
MahaRERA QR
Shiv Shanti Residency
MahaRERA — P99000020975
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable5
🔢Total Units70
🏡Residential70
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable5
🔢Total Units30
🏡Residential30
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable5
🔢Total Units30
🏡Residential30

Apartment Configurations

BUILDING N0-1 TYPE-C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK31.43707
0%
1BHK31.77707
0%
1BHK32.5821021
0%
1BHK33.33707
0%
1BHK33.49707
0%
2BHK49.6814014
0%
2BHK49.87707
0%

BUILDING NO-2 TYPE -B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK23.82963
67%
1 BHK24.911073
70%
1 BHK27.54532
60%
1 RK18.75101
0%
2 BHK42.25541
80%

BUILDING NO-3 TYPE-A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
123.88550
100%
1 BHK23.78981
89%
1 BHK27.54523
40%
1 R K18.75101
0%
2 BHK36.4310100
100%

Construction Progress

BUILDING N0-1 TYPE-C

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO-2 TYPE -B

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO-3 TYPE-A

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station50%
✅Energy managemcnt50%
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths50%
✅Landscaping & Tree Planting50%
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)50%
✅Solid Waste Management And Disposal50%
✅Storm Water Drains50%
⬜Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water50%
✅Water Supply50%
✅Water conservation /Rain water harvesting50%