SHREE GANESH RESIDENCYProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700051704
Registration No.
REA51700134349
Developer
SHRI GANESH ENTERPRISES
Architect
G N GANDHE
Project Bank
BANK OF BARODA
Proposed Possession
2027-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
94
Units Sold
19 (20%)
Buildings
3
Project Area
3223.00 sq.m
Total FSI
5017.36
MahaRERA QR
SHREE GANESH RESIDENCY
MahaRERA — P51700051704
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors7
✅Sanctioned7
🏠Habitable6
🔢Total Units48
🏡Residential48
🏗️Proposed Floors7
✅Sanctioned7
🏠Habitable6
🔢Total Units30
🏡Residential30
🏗️Proposed Floors5
✅Sanctioned5
🏠Habitable4
🔢Total Units16
🏡Residential16

Apartment Configurations

BUILDING 1 WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK34.9606
0%
1BHK36.37606
0%
1BHK36.4412012
0%
1BHK37.34606
0%
2BHK47.27606
0%
2BHK47.86606
0%
2BHK48.79606
0%

BUILDING 1 WING B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK35.97606
0%
1BHK36.4412012
0%
2BHK41.2606
0%
2BHK41.7606
0%

BUILDING 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK32.54404
0%
1BHK41.43404
0%
1BHK48.43808
0%

Construction Progress

BUILDING 1 WING A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

BUILDING 1 WING B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

BUILDING 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
✅Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
⬜Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting

Latest Mumbai Property News

View all news →
CallWhatsApp
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now