📞 +91 98200 30685 ✉️
RERA: A51800043517

SHREE KURLAI COMPLEX

by SHREE MANGALMURTI ASSOCIATES
Kept in Abeyance P99000032754
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000032754
Registration No.
REA99000101785
Developer
SHREE MANGALMURTI ASSOCIATES
Project Bank
BASSEIN CATHOLIC CO-OP BANK LTD
Proposed Possession
2025-06-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
3
Project Area
4000.00 sq.m
Total FSI
7158.94
MahaRERA QR
SHREE KURLAI COMPLEX
MahaRERA — P99000032754
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking49
🅿️Closed Parking1
📅Completion2025-06-30
🚗Open Parking20
🅿️Closed Parking1
📅Completion2025-06-30
🚗Open Parking20
🅿️Closed Parking1
📅Completion2025-06-30

Apartment Configurations

Shree Kurlai Complex Building No 01

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.04 2 0 2
0%
1 BHK 39.94 15 0 15
0%
2 BHK 42.38 1 0 1
0%
2 BHK 49.88 5 0 5
0%

Shree Kurlai Complex Building No 02 Wing A And B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.36 1 0 1
0%
1 BHK 35.04 2 0 2
0%
1 BHK 35.31 5 0 5
0%
1 BHK 39.94 20 0 20
0%
1 BHK 40.12 10 0 10
0%
1 BHK 40.21 5 0 5
0%
2 BHK 43.38 2 0 2
0%
2 BHK 48.28 10 0 10
0%
Office space 22.64 1 0 1
0%

Shree Kurlai Complex Building No 03 Wing A And B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.04 2 0 2
0%
1 BHK 35.31 2 0 2
0%
1 BHK 39.94 20 0 20
0%
1 BHK 40.12 5 0 5
0%
1 BHK 40.21 15 0 15
0%
2 BHK 43.38 2 0 2
0%
2 BHK 48.28 10 0 10
0%
Office space 22.64 1 0 1
0%

Construction Progress

Shree Kurlai Complex Building No 01

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Shree Kurlai Complex Building No 02 Wing A And B

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Shree Kurlai Complex Building No 03 Wing A And B

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.