📞 +91 98200 30685✉️
RERA: A51800043517

Shree Om Sai Apartment

by Om Sai Mann Builders And Developers
Kept in AbeyanceP99000013020

Project Information

RERA Certificate No.
P99000013020
Registration No.
REA99000022669
Developer
Om Sai Mann Builders And Developers
Project Bank
Bassien Catholic Co Op Bank
Proposed Possession
2017-12-31
Revised Possession
2018-12-31
Extended Possession
2025-12-31
Buildings
2
Project Area
1528.28 sq.m
Total FSI
1413.80
MahaRERA QR
Shree Om Sai Apartment
MahaRERA — P99000013020
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion1900-01-01
📅Completion2022-12-31

Apartment Configurations

Shree Om Sai Apartment B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Flats850.5218126
67%
Shops129.13606
0%

Shree Om Sai Apartment C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Flats850.5218018
0%
Shops122.62606
0%

Construction Progress

Shree Om Sai Apartment B Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing15%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Shree Om Sai Apartment C Wing

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing15%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.