SHREE SALASAR ROW VILLASProject photos will appear here when available.
Project Information
RERA Certificate No.
P99000080194
Registration No.
REA99000168373
Registration Date
2025-05-06
Developer
DILIP ENTERPRISES Others
Architect
ODYSSEY ARCHITECTS AND ASSOCIATES
Project Bank
IDBI BANK
Proposed Possession
2030-04-30
Total Units
13
Units Sold
7 (54%)
Buildings
3
Project Area
1844.85 sq.m
Total FSI
1164.31
Approved FSI
1164.31
SHREE SALASAR ROW VILLAS MahaRERA — P99000080194
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable2
🔢Total
Units5
🏡Residential5
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable2
🔢Total
Units6
🏡Residential6
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable2
🔢Total
Units2
🏡Residential2
Apartment Configurations
Building No -02,Row Houses No -10 to 14
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Row House
77.01
5
0
5
0%
Building No-04, Row Houses No -19 to 24
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Row House
77.01
3
0
3
0%
Row House Landowner
77.01
3
0
3
0%
Building No-05, Row Houses No 25 and 26
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Row House
118.98
1
0
1
0%
Row House Landowner
118.98
1
0
1
0%
Construction Progress
Building No -02,Row Houses No -10 to 14
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor0%
Building No-04, Row Houses No -19 to 24
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
Stilt Floor0%
Building No-05, Row Houses No 25 and 26
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor0%
RERA Registered Amenities
⬜Aggregate area of recreational Open Space
✅Community Buildings50%
✅Electrical meter room, sub-station, receiving station10%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths70%
✅Landscaping & Tree Planting25%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)70%
⬜Solid Waste Management And Disposal
✅Storm Water Drains25%
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water