Shree Township Phase 2

by Shree Shivbali Builders Private Limited
Certificate SignedP99000051250
Shree Township Phase 2Project photos will appear here when available.

Project Information

RERA Certificate No.
P99000051250
Developer
Shree Shivbali Builders Private Limited
Architect
D S Architech
Project Bank
BASSIEN CATHOLIC CO OP BANK
Proposed Possession
2030-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
147
Units Sold
1 (1%)
Buildings
2
Project Area
6384.43 sq.m
Total FSI
5742.61
MahaRERA QR
Shree Township Phase 2
MahaRERA — P99000051250
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors7
Sanctioned7
🏠Habitable7
🔢Total Units63
🏡Residential63
🏗️Proposed Floors7
Sanctioned7
🏠Habitable7
🔢Total Units84
🏡Residential84

Apartment Configurations

BUILDING NO 5 WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK32.57707
0%
1BHK32.6214014
0%
1BHK32.7707
0%
1BHK32.7521021
0%
1BHK35.64707
0%
2BHK44.51707
0%

BUILDING NO 5 WING B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK32.6213013
0%
1BHK32.6914014
0%
1BHK32.7521021
0%
1BHK32.76707
0%
1BHK33.0101
0%
1BHK35.6414014
0%
2BHK46.84707
0%
2BHK47.85707
0%

Construction Progress

BUILDING NO 5 WING A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

BUILDING NO 5 WING B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical meter room, sub-station, receiving station
Energy managemcnt
Fire protection and fire safety requirements
Internal Roads & Footpaths20%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Supply
Water conservation /Rain water harvesting