Silicon Enclave

by Shilpriya Builders And Developers
Certificate SignedP51800007484
Silicon EnclaveProject photos will appear here when available.

Project Information

RERA Certificate No.
P51800007484
Registration No.
REA51800012101
Registration Date
2017-08-17
Developer
Shilpriya Builders And Developers
Architect
Nasa Architectural Consultants Pvt Ltd
Project Bank
HDFC BANK
Proposed Possession
2020-10-30
Revised Possession
2019-12-31
Extended Possession
2020-10-30
Units Sold
0
Buildings
3
Project Area
1631.31 sq.m
Total FSI
7484.00
Approved FSI
7484.00
MahaRERA QR
Silicon Enclave
MahaRERA — P51800007484
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors13
✅Sanctioned13
🏗️Proposed Floors13
✅Sanctioned13
🏗️Proposed Floors13
✅Sanctioned13

Apartment Configurations

WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK43.9110100
100%
1 BHK45.9911110
100%
2 BHK64.6311110
100%
2 BHK64.8411101
91%

WING B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK45.9919181
95%
2 BHK64.6410100
100%
2 BHK64.8411110
100%
2BHK53.55110
100%
3BHK111.96110
100%

WING C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK46.73330
100%
2 BHK46.99440
100%
2 BHK TENANT46.7318180
100%
2 BHK TENANT46.9918180
100%

Construction Progress

WING A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

WING B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

WING C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space100%
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
✅Fire protection and fire safety requirements100%
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting100%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
✅Solid Waste Management And Disposal100%
✅Storm Water Drains100%
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
✅Water conservation /Rain water harvesting100%