📞 +91 98200 30685✉️
RERA: A51800043517

Silver Green

by Acres Developers
Kept in AbeyanceP99000007490

Project Information

RERA Certificate No.
P99000007490
Registration No.
REA99000011357
Developer
Acres Developers
Project Bank
IDBI BANK
Proposed Possession
2017-12-31
Revised Possession
2022-07-31
Extended Possession
1900-01-01
Buildings
3
Project Area
9774.13 sq.m
Total FSI
6744.14
MahaRERA QR
Silver Green
MahaRERA — P99000007490
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion2021-07-31
📅Completion2021-07-31
📅Completion1900-01-01

Apartment Configurations

Building No 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FLAT34.8101
0%
FLAT35.34220
100%
FLAT36.51101
0%
FLAT36.6110
100%
FLAT37.58220
100%
FLAT38.32110
100%
FLAT39.36330
100%
FLAT47.62202
0%
FLAT49.11110
100%
FLAT51.16101
0%
FLAT51.69211
50%

Building No 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FLAT32.15101
0%
FLAT32.69220
100%
FLAT34.8101
0%
FLAT35.34220
100%
FLAT35.37101
0%
FLAT36.22101
0%
FLAT38.32202
0%
FLAT39.36330
100%
FLAT49.11101
0%
FLAT49.24110
100%

Building No 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
FLAT32.15110
100%
FLAT32.69202
0%
FLAT34.8211
50%
FLAT35.34404
0%
FLAT35.37110
100%
FLAT36.32110
100%
FLAT36.51101
0%
FLAT36.6202
0%
FLAT37.58321
67%
FLAT38.32431
75%
FLAT39.36963
67%
FLAT47.62220
100%
FLAT49.11211
50%
FLAT49.24422
50%
FLAT49.65101
0%
FLAT51.16101
0%
FLAT51.69202
0%

Construction Progress

Building No 1

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises12%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises10%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.45%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure62%

Building No 2

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises55%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing75%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Building No 3

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises15%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises10%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.30%
Stilt Floor50%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing12%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)30%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.