📞 +91 98200 30685✉️
RERA: A51800043517

Spanish Residency

by Shantee Realty And Life Space
Kept in AbeyanceP99000021113

Project Information

RERA Certificate No.
P99000021113
Developer
Shantee Realty And Life Space
Architect
Muffadal Merchant
Project Bank
THE COSMOS CO-OPERATIVE BANK LTD
Proposed Possession
2024-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
1
Project Area
548.00 sq.m
Total FSI
1074.75
Approved FSI
1000.00
MahaRERA QR
Spanish Residency
MahaRERA — P99000021113
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking1
📅Completion2023-04-30

Apartment Configurations

Spanish Residency

TypeCarpet (sq.ft)TotalBookedAvailableStatus
CLUSTER 1 ROW 133.87101
0%
CLUSTER 1 ROW 533.5101
0%
CLUSTER 10 ROW 133.5110
100%
CLUSTER 10 ROW 1043.5101
0%
CLUSTER 10 ROW 1143.5101
0%
CLUSTER 10 ROW 1243.5101
0%
CLUSTER 10 ROW 943.5101
0%
CLUSTER 10 ROW NO 736.73101
0%
CLUSTER 12 ROW 133.5110
100%
CLUSTER 12 ROW 336.86110
100%
CLUSTER 12 ROW 438.21110
100%
CLUSTER 12 ROW 936.86110
100%
CLUSTER 13 ROW 1033.5110
100%
CLUSTER 13 ROW 333.5110
100%
CLUSTER 13 ROW 433.5110
100%
CLUSTER 1667.95110
100%
CLUSTER 2 ROW 1133.5101
0%
CLUSTER 2 ROW 1233.5101
0%
CLUSTER 2 ROW 333.5101
0%
CLUSTER 2 ROW1333.5101
0%
CLUSTER 3 ROW 1033.5101
0%
CLUSTER 3 ROW 236.86101
0%
CLUSTER 3 ROW 333.5101
0%
CLUSTER 3 ROW 433.5101
0%
CLUSTER 3 ROW 836.86101
0%
CLUSTER 3 ROW 933.5101
0%
CLUSTER 4 ROW 1333.5101
0%
CLUSTER 4 ROW 1433.5101
0%
CLUSTER 4 ROW 1533.5101
0%
CLUSTER 4 ROW 836.86101
0%
CLUSTER 5 ROW 1036.86101
0%
CLUSTER 5 ROW 1133.5101
0%
CLUSTER 5 ROW 336.86110
100%
CLUSTER 5 ROW 436.86101
0%
CLUSTER 5 ROW 533.5101
0%
CLUSTER 5 ROW 936.86101
0%
CLUSTER 6 ROW 436.86101
0%
CLUSTER 6 ROW 533.5101
0%
CLUSTER 7 ROW 1336.86101
0%
CLUSTER 7 ROW 1536.46101
0%
CLUSTER 7 ROW 833.94101
0%
CLUSTER 8 ROW 436.86101
0%
CLUSTER 9 ROW 433.78110
100%
CLUSTER 9 ROW 536.86101
0%
CLUSTER 9 ROW 636.86101
0%

Construction Progress

Spanish Residency

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting50%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting50%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting50%
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now