Sparsh Phase-II

by Shree Enterprises Partnership
Certificate SignedP52000016230
Sparsh Phase-IIProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000016230
Registration No.
REA52000036345
Registration Date
2021-09-10
Developer
Shree Enterprises Partnership
Architect
AN Arch Architect & Planner
Project Bank
ICICI BANK LIMITED
Proposed Possession
2025-12-31
Revised Possession
1900-01-01
Extended Possession
2024-12-31
Total Units
158
Units Sold
146 (92%)
Buildings
5
Project Area
1321.76 sq.m
Total FSI
6069.07
Approved FSI
2794.09
MahaRERA QR
Sparsh Phase-II
MahaRERA — P52000016230
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable8
🔢Total Units46
🏡Residential46
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total Units28
🏡Residential28

Apartment Configurations

Building no 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK Type 145.1424186
75%
2 BHK Type 245.2321
67%
2 BHK Type 345.2715141
93%
2 BHK Type 445.93440
100%

Building no 5 Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK Type 130.512120
100%
1 BHK Type 230.616160
100%

Building no 5 Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK Type 128.75321
67%
1 BHK Type 229.41431
75%
1 BHK Type 330.5660
100%
1 BHK Type 430.6880
100%
1RK Type 120.55330
100%
1RK Type 220.96440
100%

Building no 6 Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK Type 130.512120
100%
1 BHK Type 230.616151
94%

Building no 6 Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK Type 130.5651
83%
1 BHK Type 230.52330
100%
1 BHK Type 330.57440
100%
1 BHK Type 430.6880
100%
1 RK18.02761
86%

Construction Progress

Building no 4

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

Building no 5 Wing A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

Building no 5 Wing B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

Building no 6 Wing A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

Building no 6 Wing B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
✅Children Play Area
✅Club House with Gymnasium
✅Community Buildings50%
✅Electrical meter room, sub-station, receiving station85%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths90%
✅Landscaping & Tree Planting
⬜Open Parking
✅Party Lawn with performing stage
✅Sewerage (Chamber, Lines, Septic Tank , STP)90%
⬜Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Walking Trail
✅Water Supply
✅Water conservation /Rain water harvesting90%