SPM Dream City Phase 2

by Swastik Lifespace Partnership
Certificate SignedP51700077651
SPM Dream City Phase 2Project photos will appear here when available.

Project Information

RERA Certificate No.
P51700077651
Registration No.
REA51700165007
Registration Date
2025-07-30
Developer
Swastik Lifespace Partnership
Architect
Vishal Dalal
Project Bank
HDFC BANK
Proposed Possession
2031-04-30
Total Units
173
Units Sold
32 (18%)
Buildings
2
Project Area
4950.00 sq.m
Total FSI
8706.08
Approved FSI
8706.08
MahaRERA QR
SPM Dream City Phase 2
MahaRERA — P51700077651
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
✅Sanctioned6
🏠Habitable6
🔢Total Units47
🏡Residential40
🏢Non-Residential7
🏗️Proposed Floors17
✅Sanctioned17
🏠Habitable16
🔢Total Units126
🏡Residential126

Apartment Configurations

Wing C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK31.2505
0%
1BHK31.22505
0%
1BHK32.52404
0%
1BHK32.614014
0%
1RK33.87101
0%
1RK38.45101
0%
2BHK44.3510010
0%
Shop9.59101
0%
Shop13.6101
0%
Shop16.76101
0%
Shop17.08303
0%
Shop22.14101
0%

Wing E

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK31.2146046
0%
1BHK32.648048
0%
2BHK44.3532032
0%

Construction Progress

Wing C

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Wing E

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
⬜Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting