RERA: A51800043517

S.R Residency

by S.R Realty
Kept in AbeyanceP99000018786

Project Information

RERA Certificate No.
P99000018786
Developer
S.R Realty
Project Bank
IDBI
Proposed Possession
2024-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
2
Project Area
940.00 sq.m
Total FSI
1886.00
MahaRERA QR
S.R Residency
MahaRERA — P99000018786
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking1
📅Completion2023-12-31
🚗Open Parking5
📅Completion2023-12-31

Apartment Configurations

S R Residency 01

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK28.7220
100%
1 BHK30.27202
0%
1 BHK30.77321
67%
1 BHK34.72404
0%
1 BHK34.73909
0%
1 BHK37.05211
50%
1 BHK41.11404
0%
1RK29.38101
0%
2 BHK41.97413
25%
2 BHK46.68404
0%
2 BHK47.97404
0%
Office space52.8101
0%
SHOP19.27110
100%
SHOP27.36101
0%

S R Residency 02

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK28.7000
0%
1 BHK30.27000
0%
1 BHK30.77000
0%
1 BHK37.05000
0%
2 BHK41.97000
0%

Construction Progress

S R Residency 01

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises20%
Overall Percentage of Completion of the work done For the entire Building /Wing42%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure50%

S R Residency 02

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)50%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now