Sundar Residency Phase-IIProject photos will appear here when available.
Project Information
RERA Certificate No.
P52000029402
Registration No.
REA52000088391
Registration Date
2021-05-29
Developer
LAXMIKANTAN RAMAKRISHNAN VENKATRAMAN Individual
Architect
Subodh Krishna Tari
Project Bank
NKGSB COOPERATIVE BANK LIMITED
Proposed Possession
2023-05-16
Revised Possession
1900-01-01
Extended Possession
2022-09-30
Units Sold
0
Buildings
3
Project Area
1487.29 sq.m
Total FSI
1747.83
Approved FSI
1747.83
Sundar Residency Phase-II MahaRERA — P52000029402
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors3
✅Sanctioned3
🏗️Proposed Floors3
✅Sanctioned3
🏗️Proposed Floors3
✅Sanctioned3
Apartment Configurations
Building No -1 A,B and C
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
30.19
2
1
1
50%
1BHK
32.66
1
0
1
0%
1BHK
36.09
4
4
0
100%
1BHK
38.91
1
1
0
100%
2BHK
42.69
4
3
1
75%
Building No -2 D, E and F
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
30.19
8
5
3
62%
1BHK
32.66
2
2
0
100%
1RK
29.43
5
0
5
0%
Building No -3 G, H and I
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
30.49
4
0
4
0%
1BHK
31.02
6
0
6
0%
1BHK
32.02
2
0
2
0%
1BHK
33.16
1
0
1
0%
1BHK
33.84
1
0
1
0%
1BHK
34.59
2
0
2
0%
1BHK
35.95
1
0
1
0%
1RK
27.71
1
0
1
0%
Construction Progress
Building No -1 A,B and C
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Building No -2 D, E and F
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Building No -3 G, H and I
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RERA Registered Amenities
✅Aggregate area of recreational Open Space100%
✅Community Buildings100%
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
✅Fire protection and fire safety requirements100%
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting100%
✅Open Parking100%
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
✅Solid Waste Management And Disposal100%
✅Storm Water Drains100%
✅Street Lighting100%
✅Treatment And Disposal Of Sewage And Sullage Water100%