Sundar Residency Phase-IIProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000029402
Registration No.
REA52000088391
Registration Date
2021-05-29
Developer
LAXMIKANTAN RAMAKRISHNAN VENKATRAMAN Individual
Architect
Subodh Krishna Tari
Project Bank
NKGSB COOPERATIVE BANK LIMITED
Proposed Possession
2023-05-16
Revised Possession
1900-01-01
Extended Possession
2022-09-30
Units Sold
0
Buildings
3
Project Area
1487.29 sq.m
Total FSI
1747.83
Approved FSI
1747.83
MahaRERA QR
Sundar Residency Phase-II
MahaRERA — P52000029402
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors3
✅Sanctioned3
🏗️Proposed Floors3
✅Sanctioned3
🏗️Proposed Floors3
✅Sanctioned3

Apartment Configurations

Building No -1 A,B and C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK30.19211
50%
1BHK32.66101
0%
1BHK36.09440
100%
1BHK38.91110
100%
2BHK42.69431
75%

Building No -2 D, E and F

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK30.19853
62%
1BHK32.66220
100%
1RK29.43505
0%

Building No -3 G, H and I

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK30.49404
0%
1BHK31.02606
0%
1BHK32.02202
0%
1BHK33.16101
0%
1BHK33.84101
0%
1BHK34.59202
0%
1BHK35.95101
0%
1RK27.71101
0%

Construction Progress

Building No -1 A,B and C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

Building No -2 D, E and F

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

Building No -3 G, H and I

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space100%
✅Community Buildings100%
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
✅Fire protection and fire safety requirements100%
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting100%
✅Open Parking100%
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
✅Solid Waste Management And Disposal100%
✅Storm Water Drains100%
✅Street Lighting100%
✅Treatment And Disposal Of Sewage And Sullage Water100%
✅Water Supply100%
✅Water conservation /Rain water harvesting100%