SUNDAR RESIDENCYProject photos will appear here when available.
Project Information
RERA Certificate No.
P52000016733
Registration No.
REA52000039243
Registration Date
2024-08-13
Developer
LAXMIKANTAN RAMAKRISHNAN VENKATRAMAN Individual
Architect
Subodh Krishna Tari
Project Bank
NKGSB COOPERATIVE BANK LIMITED
Proposed Possession
2023-05-16
Revised Possession
2020-12-30
Extended Possession
2023-05-16
Units Sold
0
Buildings
3
Project Area
4910.00 sq.m
Total FSI
4441.83
Approved FSI
4441.83
SUNDAR RESIDENCY MahaRERA — P52000016733
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
🏗️Proposed Floors5
✅Sanctioned5
Apartment Configurations
BUILDING NUMBER 1 A, B and C Wing
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
30.03
3
3
0
100%
1BHK
31.96
10
9
1
90%
1BHK
36.41
3
2
1
67%
1BHK (Vendor)
31.96
2
0
2
0%
1RK
29.78
6
6
0
100%
2BHK
40.78
12
12
0
100%
BUILDING NUMBER 3 G, H and I Wing
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
30.89
13
6
7
46%
1BHK
31.5
5
4
1
80%
1BHK
31.89
5
5
0
100%
1BHK
34.77
3
3
0
100%
1BHK (Vendor)
30.89
5
0
5
0%
1BHK (Vendor)
31.5
1
0
1
0%
1BHK (Vendor)
31.89
1
0
1
0%
1RK
28.52
2
2
0
100%
1RK (Vendor)
28.52
1
0
1
0%
Construction Progress
BUILDING NUMBER 1 A, B and C Wing
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
BUILDING NUMBER 2 D, E and F Wing
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
BUILDING NUMBER 3 G, H and I Wing
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RERA Registered Amenities
✅Aggregate area of recreational Open Space100%
✅Community Buildings100%
⬜Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting100%
✅Open Parking100%
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Storm Water Drains100%
✅Street Lighting100%
✅Treatment And Disposal Of Sewage And Sullage Water100%