Swami Narendra Residency

by Raj Ratneshwari Developers Partnership
Certificate SignedP51700032919
Swami Narendra ResidencyProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700032919
Registration No.
REA51700101266
Registration Date
2025-08-14
Developer
Raj Ratneshwari Developers Partnership
Architect
J GURUNATHAN
Project Bank
CENTRAL BANK OF INDIA
Proposed Possession
2027-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
79
Units Sold
17 (22%)
Buildings
3
Project Area
2562.00 sq.m
Total FSI
2562.00
Approved FSI
2562.00
MahaRERA QR
Swami Narendra Residency
MahaRERA — P51700032919
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors4
✅Sanctioned4
🔢Total Units24
🏡Residential24
🏗️Proposed Floors5
✅Sanctioned5
🔢Total Units20
🏡Residential20
🏗️Proposed Floors7
✅Sanctioned7
🔢Total Units35
🏡Residential35

Apartment Configurations

7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK32.02862
75%
1BHK34.84330
100%
2BHK47.16330
100%

Construction Progress

6

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
Stilt Floor100%

8

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station50%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths25%
✅Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)33%
⬜Solid Waste Management And Disposal
✅Storm Water Drains15%
✅Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting