Swastik Epitome Building 2 Phase I Ground to 7 floors

by Hemant Ramesh Mhatre Individual
Certificate SignedP99000006718
Swastik Epitome Building 2 Phase I Ground to 7 floorsProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000006718
Registration No.
REA99000015681
Registration Date
2017-08-16
Developer
Hemant Ramesh Mhatre Individual
Architect
En Con
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2027-04-30
Revised Possession
2019-12-31
Extended Possession
2024-08-31
Total Units
182
Units Sold
121 (66%)
Buildings
5
Project Area
3421.00 sq.m
Total FSI
7957.31
Approved FSI
7957.31
MahaRERA QR
Swastik Epitome Building 2 Phase I Ground to 7 floors
MahaRERA — P99000006718
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors10
✅Sanctioned10
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors10
✅Sanctioned10
🏠Habitable7
🔢Total Units42
🏡Residential42
🏗️Proposed Floors10
✅Sanctioned10
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors10
✅Sanctioned10
🏠Habitable7
🔢Total Units42
🏡Residential42
🏗️Proposed Floors10
✅Sanctioned10
🏠Habitable7
🔢Total Units42
🏡Residential42

Apartment Configurations

C WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1.5 BHK46.41770
100%
1BHK38.55770
100%
2 BHK49.24862
75%
2BHK49.35633
50%

D WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK36.59743
57%
1 BHK37.94761
86%
1.5 BHK41.98734
43%
1.5 BHK43.53707
0%
1BHK37.5725
29%
2BHK57.84734
43%

E WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK37.191468
43%
2BHK55.3914122
86%

F WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK36.59734
43%
1.5 BHK41.98725
29%
1.5BHK43.53761
86%
1BHK37.5734
43%
1BHK37.94761
86%
2BHK57.84752
71%

G WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK36.76770
100%
1 BHK37.9714104
71%
1.5 BHK44.07716
14%
1BHK36.59725
29%
1BHK37.33752
71%

Construction Progress

C WING

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)50%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

D WING

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)50%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

E WING

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)50%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

F WING

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)50%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

G WING

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)50%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space80%
✅Community Buildings80%
✅Electrical meter room, sub-station, receiving station80%
✅Energy managemcnt50%
✅Fire protection and fire safety requirements80%
✅Internal Roads & Footpaths90%
✅Landscaping & Tree Planting50%
✅Open Parking90%
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
✅Solid Waste Management And Disposal50%
✅Storm Water Drains90%
✅Street Lighting90%
✅Treatment And Disposal Of Sewage And Sullage Water50%
✅Water Supply100%
✅Water conservation /Rain water harvesting50%

Latest Mumbai Property News