SYMPHONY

by SHREE ADINATH BUILDERS Partnership
Certificate SignedP99000016885
SYMPHONYProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000016885
Registration No.
REA99000039275
Registration Date
2021-09-10
Developer
SHREE ADINATH BUILDERS Partnership
Architect
Nishant Prabhakar Patil M S Vastu Shilp Associates
Project Bank
HDFC BANK
Proposed Possession
2022-06-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
3096.93 sq.m
Total FSI
6680.53
Approved FSI
6680.53
MahaRERA QR
SYMPHONY
MahaRERA — P99000016885
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6
🏗️Proposed Floors6
✅Sanctioned6

Apartment Configurations

SYMPHONY BLDG NO 4 TYPE D WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1.5 BHK38.48523
40%
1BHK30.7913211
15%

SYMPHONY BLDG NO 4 TYPE E WING C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK29.21404
0%
1 BHK30.417017
0%
SHOP NO 511.26101
0%
SHOP NO.112.61101
0%
SHOP NO.29.98101
0%
SHOP NO.313.65101
0%
SHOP NO.415.95101
0%
SHOP NO.69.51101
0%

SYMPHONY BUILDING NO 4 TYPE E-1 WING B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.76505
0%
1BHK30.9817710
41%
2BHK45.15431
75%
SHOP NO 1214.12101
0%
SHOP NO.1012.97101
0%
SHOP NO.1112.12101
0%
SHOP NO.1312.19101
0%
SHOP NO.79.51101
0%
SHOP NO.811.26101
0%
SHOP NO.915.95110
100%

Construction Progress

SYMPHONY BLDG NO 4 TYPE D WING A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

SYMPHONY BLDG NO 4 TYPE E WING C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

SYMPHONY BUILDING NO 4 TYPE E-1 WING B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting100%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Storm Water Drains100%
✅Street Lighting100%
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
✅Water conservation /Rain water harvesting100%