Project Information

RERA Certificate No.
P99000047358
Registration No.
REA99000118131
Registration Date
2022-10-27
Developer
AMRITA SANDIP BARMERA Individual
Architect
Mufadaal
Project Bank
SARASWAT COOPERATIVE BANK LIMITED
Proposed Possession
2024-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
33
Units Sold
13 (39%)
Buildings
2
Project Area
560.00 sq.m
Total FSI
4093.94
Approved FSI
1492.17
MahaRERA QR
TRIPURA RESIDENCY
MahaRERA — P99000047358
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
🏠Habitable7
🔢Total Units29
🏡Residential29
🚗Open Parking13
🅿️Closed Parking1
📅Completion2024-12-31
🏗️Proposed Floors1
Sanctioned1
🏠Habitable1
🔢Total Units4
🏡Residential4
🅿️Closed Parking1
📅Completion2024-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 26.280000686645508 0 0 0
0%
1Bhk 29.149999618530273 0 0 0
0%
1Bhk 29.40999984741211 0 0 0
0%
1Bhk 29.989999771118164 0 0 0
0%
1Rk 20.40999984741211 0 0 0
0%
1Rk 22.1299991607666 0 0 0
0%
1Rk 23.530000686645508 0 0 0
0%

Tripura Residency Phase I

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.15 21 11 10
52%
1 BHK 29.41 7 4 3
57%
1RK 23.53 1 0 1
0%

Tripura Residency Phase Ii

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.28 1 0 1
0%
1 BHK 29.99 1 0 1
0%
1RK 20.41 1 0 1
0%
1RK 22.13 1 0 1
0%

Construction Progress

TRIPURA RESIDENCY PHASE I

Basement (if any)100%

Tripura Residency Phase I

Excavation100%

TRIPURA RESIDENCY PHASE I

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Tripura Residency Phase I

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

TRIPURA RESIDENCY PHASE I

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Tripura Residency Phase I

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

TRIPURA RESIDENCY PHASE I

Plinth100%
Podiums (if any) 0%

Tripura Residency Phase I

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

TRIPURA RESIDENCY PHASE I

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure80%

Tripura Residency Phase I

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

TRIPURA RESIDENCY PHASE I

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Tripura Residency Phase I

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure75%

TRIPURA RESIDENCY PHASE II

Basement (if any)0%

Tripura Residency Phase Ii

Excavation0%

TRIPURA RESIDENCY PHASE II

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Tripura Residency Phase Ii

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

TRIPURA RESIDENCY PHASE II

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Tripura Residency Phase Ii

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

TRIPURA RESIDENCY PHASE II

Plinth0%
Podiums (if any) 0%

Tripura Residency Phase Ii

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

TRIPURA RESIDENCY PHASE II

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Tripura Residency Phase Ii

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

TRIPURA RESIDENCY PHASE II

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Tripura Residency Phase Ii

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.