Project Information

RERA Certificate No.
P51700051956
Registration No.
REA51700141099
Registration Date
2025-10-13
Developer
Lodha Developers Limited Company
Architect
Pradeep Kamble
Project Bank
ICICI BANK LIMITED
Proposed Possession
2027-05-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
360
Units Sold
197 (55%)
Buildings
2
Project Area
3965.86 sq.m
Total FSI
14915.38
Approved FSI
14915.38
MahaRERA QR
Tulip
MahaRERA — P51700051956
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable14
🔢Total Units180
🏡Residential180
🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable14
🔢Total Units180
🏡Residential180

Apartment Configurations

Wing C of Cluster 10 Point 05 Sector I 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.917616214
92%

Wing D of Cluster 10 Point 05 Sector I2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.921760176
0%

Construction Progress

Wing C of Cluster 10 Point 05 Sector I 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

Wing D of Cluster 10 Point 05 Sector I2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises86%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space90%
✅Community Buildings90%
✅Electrical meter room, sub-station, receiving station100%
✅Energy managemcnt90%
✅Fire protection and fire safety requirements100%
✅Internal Roads & Footpaths90%
✅Landscaping & Tree Planting95%
✅Open Parking90%
✅Sewerage (Chamber, Lines, Septic Tank , STP)90%
✅Solid Waste Management And Disposal90%
✅Storm Water Drains95%
✅Street Lighting95%
✅Treatment And Disposal Of Sewage And Sullage Water90%
✅Water Supply90%
✅Water conservation /Rain water harvesting90%