Vaayu

by Kolte-Patil Developers Limited Company
Certificate SignedP51800029034
VaayuProject photos will appear here when available.

Project Information

RERA Certificate No.
P51800029034
Registration No.
REA51800087735
Registration Date
2021-04-23
Developer
Kolte-Patil Developers Limited Company
Architect
Reza Kabul
Project Bank
AXIS BANK
Proposed Possession
2025-01-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
161
Units Sold
113 (70%)
Buildings
4
Project Area
4994.70 sq.m
Total FSI
15373.69
Approved FSI
12349.56
MahaRERA QR
Vaayu
MahaRERA — P51800029034
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors12
✅Sanctioned12
🏠Habitable12
🔢Total Units44
🏡Residential44
🏗️Proposed Floors27
✅Sanctioned27
🏠Habitable27
🔢Total Units77
🏡Residential77
🏗️Proposed Floors25
✅Sanctioned25
🏠Habitable25
🔢Total Units35
🏡Residential35
🏗️Proposed Floors25
✅Sanctioned25
🏠Habitable25
🔢Total Units5
🏡Residential5

Apartment Configurations

Wing A 21St Floor To 32Nd Floor Proposed

TypeCarpet (sq.ft)TotalBookedAvailableStatus
proposed—000
0%

Wing A Ground Floor To 20Th Floor

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK62.8720191
95%
2 BHK63.117161
94%
2 BHK63.2520191
95%
2 BHK63.620191
95%

Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.8818180
100%
1 BHK40.9310100
100%
1 BHK41.0418180
100%
1RK27.25101
0%
2 BHK50.37220
100%
2 BHK64.2115150
100%
2 BHK67.12110
100%

Wing C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.8817170
100%
1 BHK40.9411110
100%
1 BHK41.0417170
100%
1 BHK with Study46.01110
100%
2 BHK50.43110
100%
2 BHK58.3220
100%
2 BHK64.23880
100%
2 BHK67.15110
100%
2 BHK with Study82.41110
100%
3 BHK with Study97.48550
100%

Construction Progress

Wing A 21st floor to 32nd floor Proposed

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Wing A ground floor to 20th floor

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

Wing B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

Wing C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station100%
✅Energy managemcnt100%
✅Fire protection and fire safety requirements100%
✅Fitness Center100%
✅Internal Roads & Footpaths100%
✅Landscaping & Tree Planting100%
✅Mechanized Parking tower100%
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
✅Solid Waste Management And Disposal100%
✅Storm Water Drains100%
✅Street Lighting100%
✅Treatment And Disposal Of Sewage And Sullage Water100%
✅Water Supply100%
✅Water conservation /Rain water harvesting100%