📞 +91 98200 30685✉️
RERA: A51800043517

VARDAAN HERITAGE

by VARDAAN INFRASTRUCTURE AND LAND DEVELOPERS Partnership
Certificate SignedP99000077997

Project Information

RERA Certificate No.
P99000077997
Registration No.
REA99000165502
Registration Date
2024-11-19
Developer
VARDAAN INFRASTRUCTURE AND LAND DEVELOPERS Partnership
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2028-12-31
Units Sold
0
Project Area
1900.00 sq.m
Total FSI
2297.16
Approved FSI
2297.16
MahaRERA QR
VARDAAN HERITAGE
MahaRERA — P99000077997
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
🏠Habitable4
🚗Open Parking56
📅Completion2028-12-31
🏗️Proposed Floors5
Sanctioned5
🏠Habitable4
🚗Open Parking56
📅Completion2028-12-31

Apartment Configurations

Building No 1A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK27.31303
0%
1 BHK29.97202
0%
1 BHK33.26303
0%
1 BHK37.96101
0%
2 BHK45.05404
0%
LANDOWNER 1BHK27.31101
0%
LANDOWNER 1BHK29.97101
0%
LANDOWNER 1BHK36.87101
0%
LANDOWNER 2BHK44.94303
0%
LANDOWNER SHOP8.91101
0%
LANDOWNER SHOP9.44101
0%
LANDOWNER SHOP10.31101
0%
LANDOWNER SHOP11.59101
0%
LANDOWNER SHOP13.58101
0%
LANDOWNER SHOP16.8101
0%
LANDOWNER SHOP18.08101
0%
LANDWONER 2BHK47.54101
0%
Shop13.98101
0%
Shop23.41101
0%

Building No 1B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK28.53101
0%
1 BHK33.98303
0%
1 BHK34.7303
0%
1 BHK38.68101
0%
2 BHK48.09101
0%
LANDOWNER 1BHK28.53303
0%
LANDOWNER 1BHK34.7101
0%
LANDOWNER 2BHK48.09202
0%
Shop9.44303
0%
Shop19.71101
0%
Shop21.09101
0%
Shop22.0101
0%
Shop28.46101
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk27.309999465942383000
0%
1Bhk28.530000686645508000
0%
1Bhk29.969999313354492000
0%
1Bhk33.2599983215332000
0%
1Bhk33.97999954223633000
0%
1Bhk34.70000076293945000
0%
1Bhk37.959999084472656000
0%
1Bhk38.68000030517578000
0%
2Bhk45.04999923706055000
0%
2Bhk48.09000015258789000
0%
Landowner 1Bhk27.309999465942383000
0%
Landowner 1Bhk28.530000686645508000
0%
Landowner 1Bhk29.969999313354492000
0%
Landowner 1Bhk34.70000076293945000
0%
Landowner 1Bhk36.869998931884766000
0%
Landowner 2Bhk44.939998626708984000
0%
Landowner 2Bhk48.09000015258789000
0%
Landowner Shop8.90999984741211000
0%
Landowner Shop9.4399995803833000
0%
Landowner Shop10.3100004196167000
0%
Landowner Shop11.59000015258789000
0%
Landowner Shop13.579999923706055000
0%
Landowner Shop16.799999237060547000
0%
Landowner Shop18.079999923706055000
0%
Landwoner 2Bhk47.540000915527344000
0%
Shop9.4399995803833000
0%
Shop13.979999542236328000
0%
Shop19.709999084472656000
0%
Shop21.09000015258789000
0%
Shop22.0000
0%
Shop23.40999984741211000
0%
Shop28.459999084472656000
0%

Construction Progress

BUILDING NO 1A

Basement (if any)0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

BUILDING NO 1B

Basement (if any)0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Building No 1A

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 1B

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now