📞 +91 98200 30685✉️
RERA: A51800043517

VARUN INDUSTRIAL ESTATE- INDUSTRIAL BUILDING NO 2

by DEEPAK BHUPATRAI VORA Individual
Certificate SignedP99000031206

Project Information

RERA Certificate No.
P99000031206
Registration No.
REA99000095193
Registration Date
2021-10-11
Developer
DEEPAK BHUPATRAI VORA Individual
Architect
Ajay Wade And Associates
Project Bank
BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession
2023-03-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
2388.50 sq.m
Total FSI
3124.08
Approved FSI
3124.08
MahaRERA QR
VARUN INDUSTRIAL ESTATE- INDUSTRIAL BUILDING NO 2
MahaRERA — P99000031206
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors3
Sanctioned3
🚗Open Parking92
📅Completion2023-03-31

Apartment Configurations

Varun Industrial Estate- Industrial Building No 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
INDUSTRIAL GALA50.6312012
0%
INDUSTRIAL GALA51.87202
0%
INDUSTRIAL GALA62.47202
0%
INDUSTRIAL GALA67.79202
0%
INDUSTRIAL GALA72.65202
0%
INDUSTRIAL GALA77.6202
0%
INDUSTRIAL GALA77.75101
0%
INDUSTRIAL GALA83.53202
0%
INDUSTRIAL GALA83.65202
0%
INDUSTRIAL GALA92.96202
0%
INDUSTRIAL GALA96.4101
0%
INDUSTRIAL GALA103.95101
0%
INDUSTRIAL GALA116.32101
0%
INDUSTRIAL GALA128.68101
0%
INDUSTRIAL GALA139.05101
0%
INDUSTRIAL GALA144.24101
0%
INDUSTRIAL GALA160.1202
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Industrial Gala50.630001068115234000
0%
Industrial Gala51.869998931884766000
0%
Industrial Gala62.470001220703125000
0%
Industrial Gala67.79000091552734000
0%
Industrial Gala72.6500015258789000
0%
Industrial Gala77.5999984741211000
0%
Industrial Gala77.75000
0%
Industrial Gala83.52999877929688000
0%
Industrial Gala83.6500015258789000
0%
Industrial Gala92.95999908447266000
0%
Industrial Gala96.4000015258789000
0%
Industrial Gala103.94999694824219000
0%
Industrial Gala116.31999969482422000
0%
Industrial Gala128.67999267578125000
0%
Industrial Gala139.0500030517578000
0%
Industrial Gala144.24000549316406000
0%
Industrial Gala160.10000610351562000
0%

Construction Progress

VARUN INDUSTRIAL ESTATE- INDUSTRIAL BUILDING NO 2

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Varun Industrial Estate- Industrial Building No 2

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing65%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking100%
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now