VIBGYOR HEIGHTS

by EMMANUEL DEVELOPERS Partnership
Certificate Signed P99000078524
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000078524
Registration No.
REA99000164484
Registration Date
2024-12-21
Developer
EMMANUEL DEVELOPERS Partnership
Architect
A M Faroz & Associates
Project Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession
2029-12-31
Total Units
28
Units Sold
0 (0%)
Project Area
670.00 sq.m
Total FSI
1814.46
Approved FSI
1714.46
MahaRERA QR
VIBGYOR HEIGHTS
MahaRERA — P99000078524
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units19
🏡Residential12
🏢Non-Residential7
🚗Open Parking29
🅿️Closed Parking10
📅Completion2029-12-31
🏗️Proposed Floors8
Sanctioned8
🏠Habitable6
🔢Total Units9
🏡Residential9
🚗Open Parking25
🅿️Closed Parking1
📅Completion2029-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 43.209999084472656 0 0 0
0%
2Bhk 44.66999816894531 0 0 0
0%
2Bhk 61.91999816894531 0 0 0
0%
Duplex 2 Bhk 72.52999877929688 0 0 0
0%
Landowner Unit 2 Bhk 43.209999084472656 0 0 0
0%
Landowner Unit 2Bhk 44.66999816894531 0 0 0
0%
Landowner Unit 2Bhk 61.91999816894531 0 0 0
0%
Landowner Unit Shop 10.699999809265137 0 0 0
0%
Landowner Unit Shop 14.8100004196167 0 0 0
0%
Landowner Unit Shop 16.989999771118164 0 0 0
0%
Lanowner Duplex 72.52999877929688 0 0 0
0%
Office Space 119.29000091552734 0 0 0
0%
Shop 11.3100004196167 0 0 0
0%
Shop 29.739999771118164 0 0 0
0%
Shop 32.95000076293945 0 0 0
0%

Building A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 43.21 4 0 4
0%
2 BHK 61.92 4 0 4
0%
LANDOWNER UNIT 2 BHK 43.21 2 0 2
0%
LANDOWNER UNIT 2BHK 61.92 2 0 2
0%
LANDOWNER UNIT SHOP 10.7 1 0 1
0%
LANDOWNER UNIT SHOP 14.81 1 0 1
0%
LANDOWNER UNIT SHOP 16.99 1 0 1
0%
Office space 119.29 1 0 1
0%
Shop 11.31 1 0 1
0%
Shop 29.74 1 0 1
0%
Shop 32.95 1 0 1
0%

Building B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 44.67 5 0 5
0%
DUPLEX 2 BHK 72.53 1 0 1
0%
LANDOWNER UNIT 2BHK 44.67 1 0 1
0%
LANOWNER DUPLEX 72.53 2 0 2
0%

Construction Progress

BUILDING A

Basement (if any)100%

Building A

Excavation100%

BUILDING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

BUILDING A

Plinth100%
Podiums (if any) 0%

Building A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING A

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure35%

Building A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUILDING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Building A

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure35%

BUILDING B

Basement (if any)100%

Building B

Excavation100%

BUILDING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing24%

BUILDING B

Plinth100%
Podiums (if any) 0%

Building B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING B

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure40%

Building B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUILDING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Building B

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure40%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.