VIMAL'S RAMJANKI CHSL

by OMVIMAL BUILTCON LLP Partnership
Certificate Signed P99000077212
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000077212
Registration No.
REA99000160395
Registration Date
2024-07-31
Developer
OMVIMAL BUILTCON LLP Partnership
Architect
Nishit Patel Nuanced
Project Bank
IDBI BANK
Proposed Possession
2028-07-15
Total Units
131
Units Sold
0 (0%)
Project Area
1470.00 sq.m
Total FSI
6711.86
Approved FSI
6711.86
MahaRERA QR
VIMAL'S RAMJANKI CHSL
MahaRERA — P99000077212
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors7
Sanctioned7
🏠Habitable7
🔢Total Units30
🏡Residential28
🏢Non-Residential2
🅿️Closed Parking29
📅Completion2028-07-15
🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units28
🏡Residential28
🅿️Closed Parking28
📅Completion2028-07-15
🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units28
🏡Residential28
🅿️Closed Parking28
📅Completion2028-07-15
🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units28
🏡Residential28
🅿️Closed Parking28
📅Completion2028-07-15
🏗️Proposed Floors7
Sanctioned7
🏠Habitable7
🔢Total Units17
🏡Residential14
🏢Non-Residential3
🅿️Closed Parking16
📅Completion2028-07-15

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 32.0 0 0 0
0%
1Bhk 32.08000183105469 0 0 0
0%
1Bhk 34.81999969482422 0 0 0
0%
1Bhk 35.25 0 0 0
0%
1Bhk 35.560001373291016 0 0 0
0%
2Bhk 43.0 0 0 0
0%
2Bhk 45.22999954223633 0 0 0
0%
2Bhk 52.68000030517578 0 0 0
0%
2Bhk 52.720001220703125 0 0 0
0%
2Bhk 52.869998931884766 0 0 0
0%
3Bhk 64.30000305175781 0 0 0
0%
Exisitng Member Shop 106.16000366210938 0 0 0
0%
Existing Member 1Bhk 32.060001373291016 0 0 0
0%
Existing Member 1Bhk 32.06999969482422 0 0 0
0%
Existing Member 1Bhk 32.08000183105469 0 0 0
0%
Existing Member 1Bhk 34.63999938964844 0 0 0
0%
Existing Member 1Bhk 35.25 0 0 0
0%
Existing Member 2Bhk 43.0 0 0 0
0%
Existing Member 2Bhk 45.22999954223633 0 0 0
0%
Existing Member 2Bhk 52.68000030517578 0 0 0
0%
Existing Member 2Bhk 52.869998931884766 0 0 0
0%
Shop 14.039999961853027 0 0 0
0%
Shop 18.389999389648438 0 0 0
0%
Shop 19.530000686645508 0 0 0
0%
Shop 27.31999969482422 0 0 0
0%

Ram Janki Chs Wing B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 52.68 8 0 8
0%
2 BHK 52.72 7 0 7
0%
2 BHK 52.87 5 0 5
0%
EXISTING MEMBER 2BHK 52.68 6 0 6
0%
EXISTING MEMBER 2BHK 52.87 2 0 2
0%
Shop 18.39 1 0 1
0%
Shop 27.32 1 0 1
0%

Ram Janki Chs Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.25 13 0 13
0%
2 BHK 43.0 4 0 4
0%
2 BHK 45.23 6 0 6
0%
EXISTING MEMBER 2BHK 43.0 2 0 2
0%
EXISTING MEMBER 2BHK 45.23 2 0 2
0%

Ram Janki Chs Wing D

Type Carpet (sq.ft) Total Booked Available Status
EXISTING MEMBER 1BHK 32.06 14 0 14
0%
EXISTING MEMBER 1BHK 32.07 7 0 7
0%
EXISTING MEMBER 1BHK 32.08 1 0 1
0%

Ram Janki Chs Wing E

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.0 7 0 7
0%
1 BHK 34.82 7 0 7
0%
1 BHK 35.56 7 0 7
0%
EXISTING MEMBER 1BHK 34.64 7 0 7
0%

Ramjank Chsl Wing A

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 64.3 14 0 14
0%
EXISITNG MEMBER SHOP 106.16 1 0 1
0%
Shop 14.04 1 0 1
0%
Shop 19.53 1 0 1
0%

Construction Progress

RAM JANKI CHS WING B

Basement (if any)0%

Ram Janki Chs Wing B

Excavation100%

RAM JANKI CHS WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ram Janki Chs Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

RAM JANKI CHS WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ram Janki Chs Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

RAM JANKI CHS WING B

Plinth85%
Podiums (if any) 0%

Ram Janki Chs Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

RAM JANKI CHS WING B

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ram Janki Chs Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

RAM JANKI CHS WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ram Janki Chs Wing B

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RAM JANKI CHS WING C

Basement (if any)0%

Ram Janki Chs Wing C

Excavation100%

RAM JANKI CHS WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ram Janki Chs Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

RAM JANKI CHS WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ram Janki Chs Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

RAM JANKI CHS WING C

Plinth85%
Podiums (if any) 0%

Ram Janki Chs Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

RAM JANKI CHS WING C

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ram Janki Chs Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

RAM JANKI CHS WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ram Janki Chs Wing C

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RAM JANKI CHS WING D

Basement (if any)0%

Ram Janki Chs Wing D

Excavation100%

RAM JANKI CHS WING D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ram Janki Chs Wing D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

RAM JANKI CHS WING D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ram Janki Chs Wing D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

RAM JANKI CHS WING D

Plinth85%
Podiums (if any) 0%

Ram Janki Chs Wing D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

RAM JANKI CHS WING D

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ram Janki Chs Wing D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

RAM JANKI CHS WING D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ram Janki Chs Wing D

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RAM JANKI CHS WING E

Basement (if any)0%

Ram Janki Chs Wing E

Excavation100%

RAM JANKI CHS WING E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ram Janki Chs Wing E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

RAM JANKI CHS WING E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ram Janki Chs Wing E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

RAM JANKI CHS WING E

Plinth85%
Podiums (if any) 0%

Ram Janki Chs Wing E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

RAM JANKI CHS WING E

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ram Janki Chs Wing E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

RAM JANKI CHS WING E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ram Janki Chs Wing E

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RAMJANK CHSL WING A

Basement (if any)0%

Ramjank Chsl Wing A

Excavation100%

RAMJANK CHSL WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Ramjank Chsl Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

RAMJANK CHSL WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Ramjank Chsl Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

RAMJANK CHSL WING A

Plinth85%
Podiums (if any) 0%

Ramjank Chsl Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

RAMJANK CHSL WING A

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Ramjank Chsl Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

RAMJANK CHSL WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ramjank Chsl Wing A

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.