Vistara WorldProject photos will appear here when available.
Project Information
RERA Certificate No.
P52000079184
Registration No.
REA52000167602
Registration Date
2025-02-14
Developer
Vistara Buildcon Partnership
Architect
Archway Designs Dinanath G Deshpande
Project Bank
IDBI BANK
Proposed Possession
2028-10-30
Total Units
266
Units Sold
165 (62%)
Buildings
4
Project Area
5820.00 sq.m
Total FSI
13960.60
Approved FSI
12960.60
Vistara World MahaRERA — P52000079184
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total
Units28
🏡Residential28
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total
Units28
🏡Residential28
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total
Units98
🏡Residential98
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable7
🔢Total
Units112
🏡Residential112
Apartment Configurations
Building 1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
38.41
14
0
14
0%
2BHK
40.88
7
0
7
0%
3BHK
54.44
7
0
7
0%
Building 2
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1BHK
30.32
14
0
14
0%
2BHK
39.9
7
0
7
0%
2BHK
42.75
7
0
7
0%
Building 3 - Wing A, Wing B , Wing C
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1 BHK Wing A
29.97
14
0
14
0%
1 BHK Wing B
29.97
28
0
28
0%
1 BHK Wing B
30.09
7
0
7
0%
1 BHK Wing B
37.78
7
0
7
0%
1 BHK Wing C
29.97
14
0
14
0%
2 BHK Wing A
42.59
14
0
14
0%
2 BHK Wing C
42.59
14
0
14
0%
Building 4 Wing A Wing B Wing C Wing D
Type
Carpet (sq.ft)
Total
Booked
Available
Status
1 BHK Wing A
27.74
7
0
7
0%
1 BHK Wing A
30.22
7
0
7
0%
1 BHK Wing A
30.23
7
0
7
0%
1 BHK Wing A
32.17
7
0
7
0%
1 BHK Wing B
29.57
7
0
7
0%
1 BHK Wing C
31.87
7
0
7
0%
1 BHK Wing D
24.79
7
0
7
0%
1 BHK Wing D
25.28
7
0
7
0%
1 BHK Wing D
30.22
7
0
7
0%
1 BHK Wing D
30.23
7
0
7
0%
1 RK Wing B
22.79
14
0
14
0%
1 RK Wing C
22.79
14
0
14
0%
2 BHK Wing B
43.07
7
0
7
0%
2 BHK Wing C
43.07
7
0
7
0%
Construction Progress
Building 1
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Building 2
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth50%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
Building 3 - Wing A, Wing B , Wing C
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
Building 4 Wing A Wing B Wing C Wing D
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
RERA Registered Amenities
⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
⬜Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water