VRINDAWAN RESIDENCY

by SANKALP DEVELOPERS Partnership
Certificate Signed P51700015683
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700015683
Registration No.
REA51700033665
Registration Date
2020-06-19
Developer
SANKALP DEVELOPERS Partnership
Architect
Mr Vaibhav Patil
Project Bank
THE KALYAN JANATA SAHAKARI BANK LTD.
Proposed Possession
2021-03-28
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
1468.00 sq.m
Total FSI
2200.68
Approved FSI
2200.68
MahaRERA QR
VRINDAWAN RESIDENCY
MahaRERA — P51700015683
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
📅Completion2020-09-28
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking19
📅Completion2020-09-28

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 28.5 0 0 0
0%
1 Bhk 29.200000762939453 0 0 0
0%
1Bhk 28.5 0 0 0
0%
1Rk 18.760000228881836 0 0 0
0%
1Rk 22.5 0 0 0
0%
1Rk 23.329999923706055 0 0 0
0%
2 Bhk 40.29999923706055 0 0 0
0%
2Bhk 40.29999923706055 0 0 0
0%
Shop 6.610000133514404 0 0 0
0%
Shop 8.979999542236328 0 0 0
0%

A Building

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.5 8 0 8
0%
1 BHK 29.2 8 0 8
0%
1RK 18.76 2 0 2
0%
1RK 22.5 2 0 2
0%
1RK 23.33 2 0 2
0%
2 BHK 40.3 8 7 1
88%
Shop 6.61 2 0 2
0%
Shop 8.98 2 0 2
0%

B Building

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.5 8 2 6
25%
1 BHK 29.2 8 3 5
38%
2 BHK 40.3 8 4 4
50%

Construction Progress

A Building

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing20%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

B Building

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing60%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply 50%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.