Whispering Tower-AbcdProject photos will appear here when available.
Project Information
RERA Certificate No.
P51800009742
Registration No.
REA51800012444
Registration Date
2021-09-09
Developer
Housing Development And Infrastructure Ltd Company
Architect
Indrajeet Deshmukh
Project Bank
BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession
2022-10-30
Revised Possession
2022-10-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
8
Project Area
10802.72 sq.m
Total FSI
72359.30
Approved FSI
50081.66
Whispering Tower-Abcd MahaRERA — P51800009742
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors37
✅Sanctioned37
🏗️Proposed Floors12
✅Sanctioned12
🏗️Proposed Floors37
✅Sanctioned37
🏗️Proposed Floors12
✅Sanctioned12
🏗️Proposed Floors37
✅Sanctioned37
🏗️Proposed Floors12
✅Sanctioned12
🏗️Proposed Floors37
✅Sanctioned37
🏗️Proposed Floors12
✅Sanctioned12
Apartment Configurations
WING - A
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
70.3
50
10
40
20%
RESIDENTIAL
75.0
56
7
49
12%
WING - A , PHASE - II, 29TH TO 40TH FLOOR
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
70.3
22
0
22
0%
RESIDENTIAL
75.0
24
0
24
0%
WING - B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
70.4
50
3
47
6%
RESIDENTIAL
71.15
50
0
50
0%
RESIDENTIAL
106.25
56
21
35
38%
WING - B, PHASE-II, 29TH TO 40TH FLOOR
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
71.15
22
0
22
0%
RESIDENTIAL
74.4
23
0
23
0%
RESIDENTIAL
106.25
24
0
24
0%
WING - C
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
68.3
6
0
6
0%
RESIDENTIAL
70.15
44
0
44
0%
RESIDENTIAL
74.85
50
1
49
2%
RESIDENTIAL
86.7
6
0
6
0%
RESIDENTIAL
87.2
50
9
41
18%
WING - C, PHASE-II, 29TH TO 40TH FLOOR
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
68.3
1
0
1
0%
RESIDENTIAL
70.15
22
0
22
0%
RESIDENTIAL
74.85
23
0
23
0%
RESIDENTIAL
86.7
1
0
1
0%
RESIDENTIAL
87.2
22
0
22
0%
WING - D
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
70.15
50
18
32
36%
RESIDENTIAL
74.85
28
21
7
75%
RESIDENTIAL
77.65
28
1
27
4%
WING-D, PHASE-II, 29TH TO 40TH FLOOR
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL
70.15
22
1
21
5%
RESIDENTIAL
74.85
12
0
12
0%
RESIDENTIAL
77.65
12
0
12
0%
Construction Progress
WING - A
Basement (if any)0%
Excavation30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WING - A , PHASE - II, 29TH TO 40TH FLOOR
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WING - B
Basement (if any)75%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth75%
Podiums (if any)8%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WING - B, PHASE-II, 29TH TO 40TH FLOOR
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WING - C
Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WING - C, PHASE-II, 29TH TO 40TH FLOOR
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WING - D
Basement (if any)0%
Excavation25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
WING-D, PHASE-II, 29TH TO 40TH FLOOR
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
RERA Registered Amenities
✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station30%
✅Energy managemcnt
✅Fire protection and fire safety requirements
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
⬜Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water