White Rose

by M/S Eeshan Enterprises
Certificate SignedP51700019187
White RoseProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700019187
Registration No.
REA51700047592
Registration Date
2023-10-10
Developer
M/S Eeshan Enterprises
Architect
NEXSTEP CONSULTANT
Project Bank
IDBI BANK
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
2025-12-31
Total Units
164
Units Sold
142 (87%)
Buildings
2
Project Area
2060.50 sq.m
Total FSI
6356.64
MahaRERA QR
White Rose
MahaRERA — P51700019187
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors26
Sanctioned26
🏠Habitable25
🔢Total Units5
🏡Residential4
🏢Non-Residential1
🏗️Proposed Floors31
Sanctioned31
🏠Habitable30
🔢Total Units159
🏡Residential137
🏢Non-Residential22

Apartment Configurations

Krantinagar Rahivashi Sangh Sahakari Grihanirman S

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK27.88440
100%
Office space13.38110
100%

White Rose Building No B2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK15.61101
0%
1BHK37.5913130
100%
1BHK38.57110
100%
1BHK38.8222184
82%
1BHK38.83918
11%
1BHK38.9520137
65%
1BHK40.47853
62%
1BHK40.5911110
100%
1BHK57.45110
100%
1BHK211.31110
100%
2BHK53.5812120
100%
2BHK53.88110
100%
2BHK53.8916160
100%
2BHK54.67110
100%
2BHK55.161165
55%
2BHK56.29642
67%
Duplex54.79330
100%
Office space50.09110
100%
Office space51.19110
100%
Office space59.85101
0%
Office space60.0110
100%
Office space121.12110
100%
Office space121.17220
100%
Office space145.39110
100%
Office space145.77110
100%
Office space250.71101
0%
Shop12.87110
100%
Shop12.92110
100%
Shop14.08110
100%
Shop20.12110
100%
Shop20.9220
100%
Shop40.24110
100%
Shop Tenant16.42110
100%
Shop Tenant16.48110
100%
Shop Tenant20.9220
100%
Shop Tenant26.85110
100%

Construction Progress

Krantinagar Rahivashi Sangh Sahakari Grihanirman S

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

White Rose Building No B2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises80%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical meter room, sub-station, receiving station30%
Energy managemcnt70%
Fire protection and fire safety requirements75%
Internal Roads & Footpaths
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Supply
Water conservation /Rain water harvesting