Project Information

RERA Certificate No.
P99000017533
Developer
Kush Vishwakarma
Project Bank
IDBI BANK
Proposed Possession
2020-11-30
Revised Possession
1900-01-01
Extended Possession
2025-12-31
Buildings
2
Project Area
1344.28 sq.m
Total FSI
1344.28
MahaRERA QR
Yash Apartment
MahaRERA — P99000017533
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking24
📅Completion2020-05-31
🚗Open Parking24
📅Completion2020-05-31

Apartment Configurations

Yash Apartment Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK21.53110
100%
1 BHK25.31413
25%
1 BHK28.35220
100%
1 BHK30.08110
100%
1 BHK30.2110
100%
1 BHK30.82220
100%
1 BHK39.29101
0%
SHOP14.08101
0%
SHOP14.85101
0%
SHOP17.21101
0%
SHOP17.58101
0%

Yash Apartment Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK25.31413
25%
1 BHK28.35101
0%
1 BHK30.82101
0%
1 BHK30.83101
0%
SHOP14.14101
0%
SHOP14.85101
0%
SHOP17.21101
0%
SHOP17.58101
0%

Construction Progress

Yash Apartment Wing A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure25%

Yash Apartment Wing B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure25%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.