Yogakshema Residency Phase-II

by Superb Maa Infra and Housing LLP Partnership
Certificate SignedP52000053597
Yogakshema Residency Phase-IIProject photos will appear here when available.

Project Information

RERA Certificate No.
P52000053597
Registration No.
REA52000146125
Registration Date
2023-11-10
Developer
Superb Maa Infra and Housing LLP Partnership
Architect
VAO Architects Research And Design Studio
Project Bank
ICICI BANK LIMITED
Proposed Possession
2026-12-31
Total Units
505
Units Sold
182 (36%)
Buildings
4
Project Area
14763.52 sq.m
Total FSI
46682.90
Approved FSI
21517.11
MahaRERA QR
Yogakshema Residency Phase-II
MahaRERA — P52000053597
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable27
🔢Total Units207
🏡Residential207
🏗️Proposed Floors27
✅Sanctioned27
🏠Habitable25
🔢Total Units192
🏡Residential192
🏗️Proposed Floors29
✅Sanctioned29
🏠Habitable27
🔢Total Units106
🏡Residential106
🏗️Proposed Floors2
✅Sanctioned2

Apartment Configurations

Block C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.921014061
40%
2 BHK54.331064660
43%

Block D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK47.41000
0%

Block E

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK83.22220
100%
3 BHK105.94482523
52%

Block F

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK44.71000
0%

Construction Progress

Block C

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure17%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
Stilt Floor100%

Block D

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Block E

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure7%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks4%
Stilt Floor100%

Block F

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
✅Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths4%
✅Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
⬜Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting