📞 +91 98200 30685 ✉️
RERA: A51800043517

AASHRAY AANAND

by AASHRAY INFRA Partnership
Certificate Signed P51700008344
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700008344
Registration No.
REA51700010988
Registration Date
2021-09-09
Developer
AASHRAY INFRA Partnership
Architect
Space Designers
Project Bank
BANK OF BARODA
Proposed Possession
2023-05-30
Revised Possession
2023-05-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
6
Project Area
5470.00 sq.m
Total FSI
5907.00
Approved FSI
5907.00
MahaRERA QR
AASHRAY AANAND
MahaRERA — P51700008344
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors6
Sanctioned6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Residential 19.209999084472656 0 0 0
0%
Residential 19.31999969482422 0 0 0
0%
Residential 19.829999923706055 0 0 0
0%
Residential 19.860000610351562 0 0 0
0%
Residential 20.329999923706055 0 0 0
0%
Residential 20.3700008392334 0 0 0
0%
Residential 21.3700008392334 0 0 0
0%
Residential 22.239999771118164 0 0 0
0%
Residential 22.649999618530273 0 0 0
0%
Residential 22.700000762939453 0 0 0
0%
Residential 23.25 0 0 0
0%
Residential 23.459999084472656 0 0 0
0%
Residential 23.920000076293945 0 0 0
0%
Residential 24.010000228881836 0 0 0
0%
Residential 24.1299991607666 0 0 0
0%
Residential 24.6200008392334 0 0 0
0%
Residential 25.420000076293945 0 0 0
0%
Residential 28.459999084472656 0 0 0
0%
Residential 28.6200008392334 0 0 0
0%
Residential 28.65999984741211 0 0 0
0%
Residential 29.25 0 0 0
0%
Residential 29.350000381469727 0 0 0
0%
Residential 29.969999313354492 0 0 0
0%
Residential 30.81999969482422 0 0 0
0%
Residential 31.729999542236328 0 0 0
0%
Residential 38.04999923706055 0 0 0
0%
Residential 42.150001525878906 0 0 0
0%
Residential 43.189998626708984 0 0 0
0%
Residential 44.119998931884766 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 19.86 4 0 4
0%
RESIDENTIAL 20.33 1 0 1
0%
RESIDENTIAL 21.37 4 0 4
0%
RESIDENTIAL 22.24 8 0 8
0%
RESIDENTIAL 24.62 4 0 4
0%
RESIDENTIAL 28.46 1 0 1
0%
RESIDENTIAL 30.82 4 0 4
0%
RESIDENTIAL 31.73 8 0 8
0%
RESIDENTIAL 43.19 1 0 1
0%
RESIDENTIAL 44.12 1 0 1
0%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 19.86 4 0 4
0%
RESIDENTIAL 20.33 1 0 1
0%
RESIDENTIAL 21.37 4 0 4
0%
RESIDENTIAL 22.24 8 0 8
0%
RESIDENTIAL 24.62 4 0 4
0%
RESIDENTIAL 28.46 1 0 1
0%
RESIDENTIAL 30.82 4 0 4
0%
RESIDENTIAL 31.73 8 0 8
0%
RESIDENTIAL 43.19 1 0 1
0%
RESIDENTIAL 44.12 1 0 1
0%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 19.83 4 0 4
0%
RESIDENTIAL 22.7 16 0 16
0%
RESIDENTIAL 28.66 1 0 1
0%

D Wing

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 19.83 12 0 12
0%
RESIDENTIAL 20.37 2 0 2
0%
RESIDENTIAL 22.7 12 0 12
0%
RESIDENTIAL 28.66 2 0 2
0%
RESIDENTIAL 29.35 4 0 4
0%
RESIDENTIAL 38.05 1 0 1
0%

E Wing

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 19.21 8 0 8
0%
RESIDENTIAL 19.32 8 0 8
0%
RESIDENTIAL 22.65 2 0 2
0%
RESIDENTIAL 22.7 4 0 4
0%
RESIDENTIAL 23.46 4 0 4
0%
RESIDENTIAL 23.92 4 0 4
0%
RESIDENTIAL 24.13 4 0 4
0%
RESIDENTIAL 25.42 4 0 4
0%
RESIDENTIAL 28.66 2 0 2
0%
RESIDENTIAL 29.25 1 0 1
0%
RESIDENTIAL 42.15 1 0 1
0%

F Wing

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 22.7 24 0 24
0%
RESIDENTIAL 23.25 4 0 4
0%
RESIDENTIAL 24.01 4 0 4
0%
RESIDENTIAL 28.62 1 0 1
0%
RESIDENTIAL 28.66 3 0 3
0%
RESIDENTIAL 29.97 1 0 1
0%

Construction Progress

A WING

Basement (if any)0%

A Wing

Excavation0%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

A WING

Plinth0%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

A Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

B WING

Basement (if any)0%

B Wing

Excavation0%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

B WING

Plinth0%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

B Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

C WING

Basement (if any)100%

C Wing

Excavation100%

C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%

C WING

Plinth100%
Podiums (if any) 0%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

C WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

C Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

D WING

Basement (if any)100%

D Wing

Excavation100%

D WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

D Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

D WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

D Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%

D WING

Plinth100%
Podiums (if any) 0%

D Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

D WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

D Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

D WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

D Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

E WING

Basement (if any)100%

E Wing

Excavation100%

E WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

E Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

E WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

E Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing50%

E WING

Plinth100%
Podiums (if any) 0%

E Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

E WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

E Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

E WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

E Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

F WING

Basement (if any)0%

F Wing

Excavation100%

F WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

F Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

F WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

F Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing30%

F WING

Plinth0%
Podiums (if any) 100%

F Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

F WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

F Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

F WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

F Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums100%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.