Aditya Apartments

by Navin Naranji Jain Individual
Certificate SignedP51700010512
Aditya ApartmentsProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700010512
Registration No.
REA51700020299
Registration Date
2017-08-31
Developer
Navin Naranji Jain Individual
Architect
Ulhas Kshirsagar
Project Bank
BANK OF BARODA
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
11400.00 sq.m
Total FSI
11056.92
Approved FSI
6259.23
MahaRERA QR
Aditya Apartments
MahaRERA โ€” P51700010512
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors6
โœ…Sanctioned6
๐Ÿ—๏ธProposed Floors6
โœ…Sanctioned6
๐Ÿ—๏ธProposed Floors6
โœ…Sanctioned6

Apartment Configurations

Bldg B 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK37.931394
69%
2BHK49.44541
80%

Bldg B1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK33.13532
60%
1BHK37.94871
88%
1RK24.5541
80%

Bldg- A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.0844
50%
2BHK46.46550
100%

Construction Progress

Bldg B 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

Bldg B1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

Bldg- A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

โœ…Aggregate area of recreational Open Space100%
โœ…Community Buildings100%
โœ…Electrical meter room, sub-station, receiving station
โœ…Energy managemcnt
โœ…Fire protection and fire safety requirements
โœ…Internal Roads & Footpaths
โœ…Landscaping & Tree Planting80%
โœ…Open Parking60%
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)50%
โœ…Solid Waste Management And Disposal
โœ…Storm Water Drains
โœ…Street Lighting
โœ…Treatment And Disposal Of Sewage And Sullage Water
โœ…Water Supply
โœ…Water conservation /Rain water harvesting50%