📞 +91 98200 30685 ✉️
RERA: A51800043517

ASHTAVINAYAK AVENUE

by Ashtavinayak Infrastructure Partnership
Certificate Signed P51700009467
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700009467
Registration No.
REA51700016153
Registration Date
2017-08-22
Developer
Ashtavinayak Infrastructure Partnership
Architect
Samarthya Engineers Jitendra S Patel
Project Bank
IDBI BANK
Proposed Possession
2017-12-31
Revised Possession
2017-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
2125.00 sq.m
Total FSI
6245.26
Approved FSI
3078.26
MahaRERA QR
ASHTAVINAYAK AVENUE
MahaRERA — P51700009467
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🚗Open Parking2
🅿️Closed Parking1
📅Completion2017-12-31
🏗️Proposed Floors9
Sanctioned9
🚗Open Parking2
🅿️Closed Parking1
📅Completion2017-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 29.170000076293945 0 0 0
0%
1Bhk 29.469999313354492 0 0 0
0%
1Bhk 29.649999618530273 0 0 0
0%
1Bhk 29.719999313354492 0 0 0
0%
1Bhk 29.729999542236328 0 0 0
0%
1Bhk 30.190000534057617 0 0 0
0%
1Bhk 30.270000457763672 0 0 0
0%
1Bhk 31.149999618530273 0 0 0
0%
1Bhk 34.02000045776367 0 0 0
0%
Shop 9.800000190734863 0 0 0
0%
Shop 9.989999771118164 0 0 0
0%
Shop 11.930000305175781 0 0 0
0%
Shop 11.960000038146973 0 0 0
0%
Shop 12.039999961853027 0 0 0
0%
Shop 14.199999809265137 0 0 0
0%

Ashtavinayak Avenue Building No 1 Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.17 7 7 0
100%
1 BHK 29.47 7 6 1
86%
1 BHK 29.65 2 2 0
100%
1 BHK 29.72 14 14 0
100%
1 BHK 29.73 1 1 0
100%
1 BHK 31.15 7 7 0
100%
1 BHK 34.02 7 4 3
57%
SHOP 9.8 2 1 1
50%
SHOP 9.99 2 1 1
50%
SHOP 11.96 1 0 1
0%
SHOP 12.04 1 1 0
100%
SHOP 14.2 1 1 0
100%

Ashtavinayak Avenue Building No 1 Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.17 7 7 0
100%
1 BHK 29.47 7 6 1
86%
1 BHK 29.65 7 7 0
100%
1 BHK 29.72 7 7 0
100%
1 BHK 29.73 1 1 0
100%
1 BHK 30.19 1 1 0
100%
1 BHK 30.27 1 1 0
100%
1 BHK 31.15 7 7 0
100%
1 BHK 34.02 7 7 0
100%
SHOP 9.8 1 1 0
100%
SHOP 9.99 1 1 0
100%
SHOP 11.93 1 0 1
0%
SHOP 11.96 1 0 1
0%
SHOP 12.04 1 1 0
100%
SHOP 14.2 2 1 1
50%

Construction Progress

ASHTAVINAYAK AVENUE BUILDING NO 1 WING A

Basement (if any)100%

Ashtavinayak Avenue Building No 1 Wing A

Excavation100%

ASHTAVINAYAK AVENUE BUILDING NO 1 WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Ashtavinayak Avenue Building No 1 Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

ASHTAVINAYAK AVENUE BUILDING NO 1 WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Ashtavinayak Avenue Building No 1 Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

ASHTAVINAYAK AVENUE BUILDING NO 1 WING A

Plinth100%
Podiums (if any) 0%

Ashtavinayak Avenue Building No 1 Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

ASHTAVINAYAK AVENUE BUILDING NO 1 WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Ashtavinayak Avenue Building No 1 Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ASHTAVINAYAK AVENUE BUILDING NO 1 WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Ashtavinayak Avenue Building No 1 Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

ASHTAVINAYAK AVENUE BUILDING NO 1 WING B

Basement (if any)100%

Ashtavinayak Avenue Building No 1 Wing B

Excavation100%

ASHTAVINAYAK AVENUE BUILDING NO 1 WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Ashtavinayak Avenue Building No 1 Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ASHTAVINAYAK AVENUE BUILDING NO 1 WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Ashtavinayak Avenue Building No 1 Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%

ASHTAVINAYAK AVENUE BUILDING NO 1 WING B

Plinth100%
Podiums (if any) 0%

Ashtavinayak Avenue Building No 1 Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ASHTAVINAYAK AVENUE BUILDING NO 1 WING B

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Ashtavinayak Avenue Building No 1 Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ASHTAVINAYAK AVENUE BUILDING NO 1 WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Ashtavinayak Avenue Building No 1 Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.