📞 +91 98200 30685 ✉️
RERA: A51800043517

D3 Zinnia

by Neelkanth Mansions and Infrastructure Pvt Ltd Company
Certificate Signed P51700013969
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700013969
Registration No.
REA51700025910
Registration Date
2021-09-09
Developer
Neelkanth Mansions and Infrastructure Pvt Ltd Company
Architect
Saakaar Architects
Project Bank
HDFC BANK
Proposed Possession
2021-10-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
439.32 sq.m
Total FSI
8816.37
Approved FSI
8816.37
MahaRERA QR
D3 Zinnia
MahaRERA — P51700013969
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors31
Sanctioned31
🚗Open Parking20
🅿️Closed Parking208
📅Completion2020-10-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2.5 Bhk 73.19999694824219 0 0 0
0%
2.5 Bhk 73.51000213623047 0 0 0
0%
3 Bhk 90.8499984741211 0 0 0
0%
3 Bhk 91.16999816894531 0 0 0
0%

Zinnia

Type Carpet (sq.ft) Total Booked Available Status
2.5 BHK 73.2 27 5 22
19%
2.5 BHK 73.51 23 4 19
17%
3 BHK 90.85 27 6 21
22%
3 BHK 91.17 27 3 24
11%

Construction Progress

ZINNIA

Basement (if any)100%

Zinnia

Excavation100%

ZINNIA

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Zinnia

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

ZINNIA

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Zinnia

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

ZINNIA

Plinth100%
Podiums (if any) 100%

Zinnia

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

ZINNIA

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Zinnia

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ZINNIA

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Zinnia

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.