📞 +91 98200 30685 ✉️
RERA: A51800043517

DEV RATNA

by SDC DEVELOPERS PRIVATE LIMITED Company
Certificate Signed P51700007785
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700007785
Registration No.
REA51700013493
Registration Date
2017-08-18
Developer
SDC DEVELOPERS PRIVATE LIMITED Company
Architect
Subhash N Shah
Project Bank
IDBI BANK
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
2224.96 sq.m
Total FSI
2544.19
Approved FSI
2224.96
MahaRERA QR
DEV RATNA
MahaRERA — P51700007785
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors10
Sanctioned10
🅿️Closed Parking18
📅Completion2019-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 2 40.61000061035156 0 0 0
0%
1Bhk 1 40.209999084472656 0 0 0
0%
2 Bhk 1 62.47999954223633 0 0 0
0%
2 Bhk 2 62.54999923706055 0 0 0
0%
2 Bhk 3 58.09000015258789 0 0 0
0%
2Bhk 60.099998474121094 0 0 0
0%

Dev Ratna

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 1 40.21 12 5 7
42%
1 BHK 2 40.61 7 1 6
14%
2 BHK 60.1 1 1 0
100%
2 BHK 1 62.48 7 5 2
71%
2 BHK 2 62.55 7 6 1
86%
2 BHK 3 58.09 7 7 0
100%

Construction Progress

DEV RATNA

Basement (if any)100%

Dev Ratna

Excavation100%

DEV RATNA

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Dev Ratna

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

DEV RATNA

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Dev Ratna

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

DEV RATNA

Plinth100%
Podiums (if any) 0%

Dev Ratna

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

DEV RATNA

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Dev Ratna

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

DEV RATNA

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Dev Ratna

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.