📞 +91 98200 30685 ✉️
RERA: A51800043517

Eknath Heights

by Omkar Enterprises
Kept in Abeyance P51700013019
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700013019
Developer
Omkar Enterprises
Architect
Shirish Gajanan Nachane
Project Bank
VIJAYA BANK
Proposed Possession
2019-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Buildings
2
Project Area
1720.00 sq.m
Total FSI
2215.43
Approved FSI
250.00
MahaRERA QR
Eknath Heights
MahaRERA — P51700013019
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion1900-01-01
🅿️Closed Parking13
📅Completion2019-12-31

Apartment Configurations

Building No 1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.29 1 0 1
0%
2 BHK 45.68 3 0 3
0%
2 BHK 46.27 3 0 3
0%

Building No 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 32.49 3 3 0
100%
1 BHK 32.5 3 3 0
100%
1 BHK 32.71 6 5 1
83%
1 BHK 38.06 1 1 0
100%
1 BHK 38.48 4 4 0
100%
1 BHK 38.67 1 1 0
100%
1 BHK 38.99 1 1 0
100%
1 BHK 39.09 5 5 0
100%
1 BHK 39.6 1 0 1
0%
2 BHK 50.43 6 4 2
67%
2 BHK 50.45 1 1 0
100%
2 BHK 50.46 5 5 0
100%
SHOP 6.77 1 0 1
0%
SHOP 8.62 1 0 1
0%
SHOP 11.93 1 0 1
0%
SHOP 15.27 1 0 1
0%

Construction Progress

Building No 1

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 2

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises20%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Stilt Floor75%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.