📞 +91 98200 30685 ✉️
RERA: A51800043517

Gayatri Complex

by Kanubhai Mohanbhai Lakkad Individual
Certificate Signed P51700009950
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700009950
Registration No.
REA51700012950
Registration Date
2017-08-23
Developer
Kanubhai Mohanbhai Lakkad Individual
Architect
Rp Asundaria
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
2024-08-19
Units Sold
0
Buildings
5
Project Area
2600.00 sq.m
Total FSI
2210.00
Approved FSI
2210.00
MahaRERA QR
Gayatri Complex
MahaRERA — P51700009950
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors1
Sanctioned1
📅Completion2022-01-30
🏗️Proposed Floors5
Sanctioned5
🚗Open Parking10
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors6
Sanctioned6
🚗Open Parking10
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors7
Sanctioned7
🚗Open Parking10
🅿️Closed Parking1
📅Completion2022-01-31
🏗️Proposed Floors6
Sanctioned6
🚗Open Parking10
🅿️Closed Parking1
📅Completion2022-01-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 25.079999923706055 0 0 0
0%
1Bhk 26.290000915527344 0 0 0
0%
1Bhk 31.5 0 0 0
0%
1Bhk 34.029998779296875 0 0 0
0%
1Bhk 34.43000030517578 0 0 0
0%
1Bhk 34.439998626708984 0 0 0
0%
1Bhk 34.459999084472656 0 0 0
0%
1Bhk 34.5099983215332 0 0 0
0%
1Bhk 34.560001373291016 0 0 0
0%
1Bhk 34.56999969482422 0 0 0
0%
1Bhk 34.599998474121094 0 0 0
0%
1Bhk 34.66999816894531 0 0 0
0%
1Bhk 37.58000183105469 0 0 0
0%
1Bhk 37.900001525878906 0 0 0
0%
1Bhk 38.459999084472656 0 0 0
0%
1Bhk 39.939998626708984 0 0 0
0%
1Bhk 42.0 0 0 0
0%
1Bhk 42.27000045776367 0 0 0
0%
1Bhk 42.900001525878906 0 0 0
0%
1Bhk 52.56999969482422 0 0 0
0%
Shop 11.609999656677246 0 0 0
0%
Shop 13.380000114440918 0 0 0
0%
Shop 14.300000190734863 0 0 0
0%

Building No 1

Type Carpet (sq.ft) Total Booked Available Status
Shop 11.61 1 1 0
100%
Shop 13.38 1 1 0
100%
Shop 14.3 1 1 0
100%

Building No 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 25.08 1 1 0
100%
1 BHK 42.27 10 7 3
70%
1 BHK 52.57 1 1 0
100%

Building No 3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 25.08 2 2 0
100%
1 BHK 26.29 2 2 0
100%
1 BHK 31.5 1 0 1
0%
1 BHK 34.43 2 0 2
0%
1 BHK 34.46 1 0 1
0%
1 BHK 34.56 1 0 1
0%
1 BHK 34.57 2 2 0
100%
1 BHK 34.6 3 3 0
100%
1 BHK 34.67 3 3 0
100%

Building No 5

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.03 2 0 2
0%
1 BHK 37.9 3 2 1
67%
1 BHK 38.46 12 0 12
0%
1 BHK 42.0 1 1 0
100%
1 BHK 42.9 3 0 3
0%

Building No4

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.44 12 1 11
8%
1 BHK 34.51 3 0 3
0%
1 BHK 37.58 2 2 0
100%
1 BHK 39.94 1 1 0
100%

Construction Progress

Building No 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Building No 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Building No 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

Building No 5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
Stilt Floor 0%

Building No4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 20%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.