Gebi Prerna

by Ashwin Kumar Jain Individual
Certificate SignedP51700014458
Gebi PrernaProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700014458
Registration No.
REA51700027323
Registration Date
2020-06-19
Developer
Ashwin Kumar Jain Individual
Architect
DURRAJ KK S Khamankar
Project Bank
SARASWAT COOPERATIVE BANK LIMITED
Proposed Possession
2029-04-30
Revised Possession
2021-06-30
Extended Possession
2025-12-31
Total Units
280
Units Sold
87 (31%)
Buildings
9
Project Area
9300.00 sq.m
Total FSI
13915.30
Approved FSI
8715.30
MahaRERA QR
Gebi Prerna
MahaRERA โ€” P51700014458
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors8
โœ…Sanctioned8
๐Ÿ Habitable7
๐Ÿ”ขTotal Units28
๐ŸกResidential28
๐Ÿ—๏ธProposed Floors8
โœ…Sanctioned8
๐Ÿ Habitable7
๐Ÿ”ขTotal Units28
๐ŸกResidential28
๐Ÿ—๏ธProposed Floors11
โœ…Sanctioned11
๐Ÿ Habitable10
๐Ÿ”ขTotal Units35
๐ŸกResidential35
๐Ÿ—๏ธProposed Floors11
โœ…Sanctioned11
๐Ÿ Habitable7
๐Ÿ”ขTotal Units35
๐ŸกResidential35
๐Ÿ—๏ธProposed Floors8
โœ…Sanctioned8
๐Ÿ Habitable7
๐Ÿ”ขTotal Units28
๐ŸกResidential28
๐Ÿ—๏ธProposed Floors11
โœ…Sanctioned11
๐Ÿ Habitable7
๐Ÿ”ขTotal Units35
๐ŸกResidential35
๐Ÿ—๏ธProposed Floors8
โœ…Sanctioned8
๐Ÿ Habitable7
๐Ÿ”ขTotal Units28
๐ŸกResidential28
๐Ÿ—๏ธProposed Floors8
โœ…Sanctioned8
๐Ÿ Habitable7
๐Ÿ”ขTotal Units28
๐ŸกResidential28
๐Ÿ—๏ธProposed Floors11
โœ…Sanctioned11
๐Ÿ Habitable9
๐Ÿ”ขTotal Units35
๐ŸกResidential35

Apartment Configurations

1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK35.628820
29%

2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK35.628424
14%

3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK39.035926
26%

4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK44.9351322
37%

5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK35.628622
21%

6

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.9435827
23%

7

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK55.928244
86%

8

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK55.928226
79%

9

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 bhk39.035035
0%

Construction Progress

1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises25%
Slabs of Super Structure25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
Stilt Floor100%

2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises25%
Slabs of Super Structure25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
Stilt Floor100%

3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
Stilt Floor100%

4

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises25%
Slabs of Super Structure25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
Stilt Floor100%

6

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

7

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

8

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

9

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

โœ…Aggregate area of recreational Open Space
โœ…Community Buildings
โœ…Electrical meter room, sub-station, receiving station
โฌœEnergy managemcnt
โœ…Fire protection and fire safety requirements
โœ…Internal Roads & Footpaths
โœ…Landscaping & Tree Planting
โœ…Open Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)
โœ…Solid Waste Management And Disposal
โœ…Storm Water Drains
โœ…Street Lighting
โœ…Treatment And Disposal Of Sewage And Sullage Water
โœ…Water Supply
โœ…Water conservation /Rain water harvesting