📞 +91 98200 30685 ✉️
RERA: A51800043517

HARISHREE RESIDENCY-2

by HARISHREE CREATIONS Partnership
Certificate Signed P51700013198
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700013198
Registration No.
REA51700023468
Registration Date
2021-09-09
Developer
HARISHREE CREATIONS Partnership
Architect
Samarthya Engineers Jitendra Patel
Proposed Possession
2021-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
1047.00 sq.m
Total FSI
2008.00
Approved FSI
2008.00
MahaRERA QR
HARISHREE RESIDENCY-2
MahaRERA — P51700013198
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🚗Open Parking4
🅿️Closed Parking4
📅Completion2020-12-31
🏗️Proposed Floors6
Sanctioned6
🚗Open Parking2
🅿️Closed Parking3
📅Completion2020-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 29.34000015258789 0 0 0
0%
1 Bhk 29.399999618530273 0 0 0
0%
1 Bhk 29.610000610351562 0 0 0
0%
1 Bhk 30.3799991607666 0 0 0
0%
1 Bhk 31.420000076293945 0 0 0
0%
1 Bhk 31.950000762939453 0 0 0
0%
1 Bhk 35.119998931884766 0 0 0
0%
1 Bhk 35.529998779296875 0 0 0
0%
1 Rk 23.3700008392334 0 0 0
0%
2 Bhk 42.33000183105469 0 0 0
0%
2 Bhk 42.709999084472656 0 0 0
0%
2 Bhk 43.029998779296875 0 0 0
0%
Shop 9.84000015258789 0 0 0
0%
Shop 10.8100004196167 0 0 0
0%
Shop 11.270000457763672 0 0 0
0%
Shop 11.970000267028809 0 0 0
0%
Shop 12.729999542236328 0 0 0
0%
Shop 13.010000228881836 0 0 0
0%
Shop 13.600000381469727 0 0 0
0%
Shop 13.779999732971191 0 0 0
0%
Shop 15.899999618530273 0 0 0
0%
Shop 16.8799991607666 0 0 0
0%
Shop 20.670000076293945 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.4 3 0 3
0%
1 BHK 29.61 4 2 2
50%
1 BHK 31.42 3 2 1
67%
1 BHK 31.95 4 2 2
50%
2 BHK 42.33 7 4 3
57%
2 BHK 42.71 3 1 2
33%
2 BHK 43.03 4 4 0
100%
SHOP 11.27 1 0 1
0%
SHOP 11.97 1 0 1
0%
SHOP 12.73 1 1 0
100%
SHOP 13.01 1 0 1
0%
SHOP 15.9 2 1 1
50%
SHOP 20.67 1 1 0
100%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.34 4 1 3
25%
1 BHK 30.38 4 2 2
50%
1 BHK 35.12 2 1 1
50%
1 BHK 35.53 2 0 2
0%
1 RK 23.37 4 0 4
0%
SHOP 9.84 2 2 0
100%
SHOP 10.81 1 1 0
100%
SHOP 13.6 1 0 1
0%
SHOP 13.78 1 0 1
0%
SHOP 16.88 1 1 0
100%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing38%

WING A

Plinth100%
Podiums (if any) 0%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING A

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure80%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure80%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing40%

WING B

Plinth100%
Podiums (if any) 0%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING B

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.