📞 +91 98200 30685 ✉️
RERA: A51800043517

Hill Side Residency Wing A B And C

by Supreme Developers
Kept in Abeyance P51700012988
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700012988
Registration No.
REA51700022902
Developer
Supreme Developers
Project Bank
IDBI BANK LTD
Proposed Possession
2022-12-30
Revised Possession
1900-01-01
Extended Possession
2024-12-30
Buildings
3
Project Area
2660.00 sq.m
Total FSI
3621.33
Approved FSI
586.45
MahaRERA QR
Hill Side Residency Wing A B And C
MahaRERA — P51700012988
Scan to verify on MahaRERA portal

Wing-wise Details

📅Completion2021-12-31
📅Completion2021-12-31
📅Completion2021-12-31

Apartment Configurations

Hill Side Residency Wing A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 20.63 3 3 0
100%
1 BHK 28.02 1 0 1
0%
1 BHK 28.5 1 0 1
0%
1 BHK 29.01 1 0 1
0%
1 BHK 29.07 1 1 0
100%
1 BHK 29.08 1 0 1
0%
1 BHK 29.37 3 3 0
100%
1 BHK 29.89 1 1 0
100%
1 BHK 31.71 1 0 1
0%
1 BHK 33.56 4 2 2
50%
2 BHK 33.78 4 3 1
75%
2 BHK 36.15 1 1 0
100%
2 BHK 38.3 2 2 0
100%
2 BHK 43.86 1 1 0
100%
2 BHK 44.37 1 1 0
100%
2 BHK 45.01 1 1 0
100%
2 BHK 57.47 1 1 0
100%
SHOP 7.6 2 1 1
50%
SHOP 9.94 1 0 1
0%
SHOP 10.03 1 0 1
0%
SHOP 10.29 2 2 0
100%

Hill Side Residency Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 23.64 1 0 1
0%
1 BHK 24.29 4 3 1
75%
1 BHK 24.36 2 2 0
100%
1 BHK 24.8 1 1 0
100%
1 BHK 24.87 1 1 0
100%
1 BHK 24.96 2 2 0
100%
1 BHK 26.89 1 1 0
100%
1 BHK 28.08 3 3 0
100%
1 BHK 28.34 1 1 0
100%
1 BHK 29.86 3 3 0
100%
1 BHK 32.36 1 1 0
100%
1 BHK 33.62 1 1 0
100%
1 RK 19.08 1 1 0
100%
1 RK 19.69 1 1 0
100%
1 RK 20.1 1 1 0
100%
1 RK 23.52 1 1 0
100%
1 RK 23.85 1 1 0
100%
1RK 21.1 1 1 0
100%
1RK 24.04 1 1 0
100%
2 BHK 42.88 2 2 0
100%
2 BHK 42.95 1 1 0
100%
2 BHK 45.01 1 1 0
100%

Hill Side Residency Wing C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.31 1 0 1
0%
1 BHK 26.77 1 0 1
0%
1 BHK 27.03 4 3 1
75%
1 BHK 27.45 1 0 1
0%
1 BHK 27.96 1 0 1
0%
1 BHK 28.12 1 0 1
0%
1 BHK 28.24 1 0 1
0%
1 BHK 28.26 4 3 1
75%
1 BHK 28.45 2 2 0
100%
1 BHK 28.99 4 2 2
50%
1 BHK 29.03 2 1 1
50%
1 BHK 29.06 4 3 1
75%
1 BHK 29.14 1 0 1
0%
1 BHK 30.01 4 0 4
0%
2 BHK 37.47 1 1 0
100%
2 BHK 38.4 6 4 2
67%
2 BHK 56.65 1 1 0
100%
2 BHK 56.97 1 1 0
100%

Construction Progress

Hill Side Residency Wing A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Hill Side Residency Wing B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Hill Side Residency Wing C

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing80%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.