📞 +91 98200 30685 ✉️
RERA: A51800043517

KARRM GARDENS - 1

by KARRM INFRASTRUCTURE PRIVATE LIMITED Company
Certificate Signed P51700008284
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700008284
Registration No.
REA51700012633
Registration Date
2020-01-16
Developer
KARRM INFRASTRUCTURE PRIVATE LIMITED Company
Architect
Fouzi And Associates (Mr Alim Fouzi)
Project Bank
AXIS BANK
Proposed Possession
2019-05-31
Revised Possession
2019-05-31
Extended Possession
2020-11-30
Units Sold
0
Buildings
10
Project Area
12079.00 sq.m
Total FSI
18449.42
Approved FSI
18449.42
MahaRERA QR
KARRM GARDENS - 1
MahaRERA — P51700008284
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
📅Completion2019-05-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-05-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-05-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-05-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-05-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-05-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-05-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-05-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-05-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-05-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 34.939998626708984 0 0 0
0%
1Bhk 38.84000015258789 0 0 0
0%
1Bhk 39.029998779296875 0 0 0
0%
1Bhk 40.13999938964844 0 0 0
0%
1Bhk 43.400001525878906 0 0 0
0%
1Rk 26.110000610351562 0 0 0
0%
1Rk 29.079999923706055 0 0 0
0%
2Bhk 50.18000030517578 0 0 0
0%
2Bhk 54.63999938964844 0 0 0
0%

Bakul

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.94 7 7 0
100%
1 BHK 39.03 8 8 0
100%
1 BHK 40.14 15 15 0
100%
1 BHK 43.4 1 1 0
100%
1RK 26.11 1 1 0
100%
1RK 29.08 1 1 0
100%
2 BHK 54.64 15 14 1
93%

Chapha

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.84 1 1 0
100%
2 BHK 50.18 31 31 0
100%

Gulab

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 50.18 32 32 0
100%

Gulmohar

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 40.14 32 32 0
100%

Jai

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.84 1 1 0
100%
2 BHK 50.18 31 31 0
100%

Jaswand

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.94 7 7 0
100%
1 BHK 39.03 8 8 0
100%
1 BHK 40.14 15 15 0
100%
1 BHK 43.4 1 1 0
100%
1RK 26.11 1 1 0
100%
1RK 29.08 1 1 0
100%
2 BHK 54.64 15 15 0
100%

Jui

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.84 1 1 0
100%
2 BHK 50.18 31 30 1
97%

Mogra

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.84 1 1 0
100%
2 BHK 50.18 31 31 0
100%

Nishigandh

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 54.64 32 31 1
97%

Parijat

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 54.64 32 32 0
100%

Construction Progress

BAKUL

Basement (if any)100%

Bakul

Excavation100%

BAKUL

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Bakul

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BAKUL

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%

Bakul

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%

BAKUL

Plinth100%
Podiums (if any) 0%

Bakul

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises5%

BAKUL

Sanitary Fittings within the flats / premises5%
Slabs of Super Structure100%

Bakul

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BAKUL

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Bakul

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

CHAPHA

Basement (if any)100%

Chapha

Excavation100%

CHAPHA

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Chapha

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%

CHAPHA

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Chapha

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing74%

CHAPHA

Plinth100%
Podiums (if any) 0%

Chapha

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30%

CHAPHA

Sanitary Fittings within the flats / premises30%
Slabs of Super Structure100%

Chapha

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

CHAPHA

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Chapha

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

GULAB

Basement (if any)100%

Gulab

Excavation100%

GULAB

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Gulab

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate35%

GULAB

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Gulab

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

GULAB

Plinth100%
Podiums (if any) 0%

Gulab

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30%

GULAB

Sanitary Fittings within the flats / premises30%
Slabs of Super Structure100%

Gulab

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

GULAB

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Gulab

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

GULMOHAR

Basement (if any)100%

Gulmohar

Excavation100%

GULMOHAR

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%

Gulmohar

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

GULMOHAR

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%

Gulmohar

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%

GULMOHAR

Plinth100%
Podiums (if any) 0%

Gulmohar

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises5%

GULMOHAR

Sanitary Fittings within the flats / premises5%
Slabs of Super Structure100%

Gulmohar

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

GULMOHAR

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Gulmohar

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing20%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

JAI

Basement (if any)100%

Jai

Excavation100%

JAI

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Jai

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20%

JAI

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Jai

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing71%

JAI

Plinth100%
Podiums (if any) 0%

Jai

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises10%

JAI

Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%

Jai

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

JAI

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Jai

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

JASWAND

Basement (if any)100%

Jaswand

Excavation100%

JASWAND

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%

Jaswand

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

JASWAND

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%

Jaswand

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises45%

JASWAND

Plinth100%
Podiums (if any) 0%

Jaswand

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises5%

JASWAND

Sanitary Fittings within the flats / premises5%
Slabs of Super Structure100%

Jaswand

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

JASWAND

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Jaswand

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing25%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

JUI

Basement (if any)100%

Jui

Excavation100%

JUI

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%

Jui

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20%

JUI

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Jui

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

JUI

Plinth100%
Podiums (if any) 0%

Jui

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises10%

JUI

Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%

Jui

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

JUI

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Jui

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing75%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MOGRA

Basement (if any)100%

Mogra

Excavation100%

MOGRA

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%

Mogra

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate10%

MOGRA

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%

Mogra

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%
Overall Percentage of Completion of the work done For the entire Building /Wing65%

MOGRA

Plinth100%
Podiums (if any) 0%

Mogra

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises10%

MOGRA

Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%

Mogra

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MOGRA

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Mogra

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

NISHIGANDH

Basement (if any)100%

Nishigandh

Excavation100%

NISHIGANDH

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%

Nishigandh

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

NISHIGANDH

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%

Nishigandh

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Overall Percentage of Completion of the work done For the entire Building /Wing59%

NISHIGANDH

Plinth100%
Podiums (if any) 0%

Nishigandh

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises5%

NISHIGANDH

Sanitary Fittings within the flats / premises5%
Slabs of Super Structure100%

Nishigandh

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

NISHIGANDH

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Nishigandh

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing45%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

PARIJAT

Basement (if any)100%

Parijat

Excavation100%

PARIJAT

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Parijat

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

PARIJAT

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%

Parijat

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%

PARIJAT

Plinth100%
Podiums (if any) 0%

Parijat

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises5%

PARIJAT

Sanitary Fittings within the flats / premises5%
Slabs of Super Structure100%

Parijat

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

PARIJAT

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Parijat

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Club House
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 20%
Energy management
Fire Protection And Fire Safety Requirements 20%
Garden
Landscaping & Tree Planting 5%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 45%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Swimming Pool
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 5%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.