📞 +91 98200 30685 ✉️
RERA: A51800043517

KARRM PANCHTATVA -1

by KARRM INFRASTRUCTURE PRIVATE LIMITED Company
Certificate Signed P51700009304
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700009304
Registration No.
REA51700015077
Registration Date
2017-08-22
Developer
KARRM INFRASTRUCTURE PRIVATE LIMITED Company
Architect
Fouzi And Associates
Project Bank
AXIS BANK
Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
2020-10-30
Units Sold
0
Buildings
11
Project Area
24700.00 sq.m
Total FSI
17937.20
Approved FSI
17937.20
MahaRERA QR
KARRM PANCHTATVA -1
MahaRERA — P51700009304
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors5
Sanctioned5
📅Completion2018-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2018-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2018-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2018-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2018-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2018-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2018-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2018-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2018-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2018-12-31
🏗️Proposed Floors5
Sanctioned5
📅Completion2018-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Rk 13.579999923706055 0 0 0
0%
1Rk 15.140000343322754 0 0 0
0%
Shop 7.340000152587891 0 0 0
0%
Shop 9.149999618530273 0 0 0
0%
Shop 11.550000190734863 0 0 0
0%
Shop 15.140000343322754 0 0 0
0%

Building 1

Type Carpet (sq.ft) Total Booked Available Status
1RK 15.14 32 28 4
88%

Building 10

Type Carpet (sq.ft) Total Booked Available Status
1RK 13.58 2 2 0
100%
1RK 15.14 74 60 14
81%
SHOP 15.14 4 4 0
100%

Building 11

Type Carpet (sq.ft) Total Booked Available Status
1RK 13.58 2 1 1
50%
1RK 15.14 74 59 15
80%
SHOP 15.14 4 4 0
100%

Building 2

Type Carpet (sq.ft) Total Booked Available Status
1RK 13.58 2 2 0
100%
1RK 15.14 74 69 5
93%
SHOP 15.14 4 4 0
100%

Building 3

Type Carpet (sq.ft) Total Booked Available Status
1RK 13.58 2 2 0
100%
1RK 15.14 78 60 18
77%

Building 4

Type Carpet (sq.ft) Total Booked Available Status
1RK 13.58 2 2 0
100%
1RK 15.14 74 62 12
84%
SHOP 15.14 4 4 0
100%

Building 5

Type Carpet (sq.ft) Total Booked Available Status
1RK 13.58 2 1 1
50%
1RK 15.14 74 61 13
82%
SHOP 7.34 2 2 0
100%
SHOP 9.15 2 1 1
50%
SHOP 11.55 1 1 0
100%
SHOP 15.14 1 1 0
100%

Building 6

Type Carpet (sq.ft) Total Booked Available Status
1RK 13.58 2 2 0
100%
1RK 15.14 74 66 8
89%
SHOP 7.34 2 2 0
100%
SHOP 9.15 2 2 0
100%
SHOP 11.55 1 1 0
100%
SHOP 15.14 1 1 0
100%

Building 7

Type Carpet (sq.ft) Total Booked Available Status
1RK 13.58 2 2 0
100%
1RK 15.14 74 69 5
93%
SHOP 7.34 2 2 0
100%
SHOP 9.15 2 2 0
100%
SHOP 11.55 1 1 0
100%
SHOP 15.14 1 1 0
100%

Building 8

Type Carpet (sq.ft) Total Booked Available Status
1RK 13.58 2 1 1
50%
1RK 15.14 74 63 11
85%
SHOP 15.14 4 4 0
100%

Building 9

Type Carpet (sq.ft) Total Booked Available Status
1RK 13.58 2 2 0
100%
1RK 15.14 74 66 8
89%
SHOP 15.14 4 3 1
75%

Construction Progress

BUILDING 1

Basement (if any)100%

Building 1

Excavation100%

BUILDING 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Building 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%

BUILDING 1

Plinth100%
Podiums (if any) 0%

Building 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Building 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building 1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING 10

Basement (if any)100%

Building 10

Excavation100%

BUILDING 10

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building 10

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 10

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building 10

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

BUILDING 10

Plinth100%
Podiums (if any) 0%

Building 10

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 10

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure55%

Building 10

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.10%

BUILDING 10

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%

Building 10

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure55%

BUILDING 11

Basement (if any)100%

Building 11

Excavation100%

BUILDING 11

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building 11

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 11

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%

Building 11

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises55%

BUILDING 11

Plinth100%
Podiums (if any) 0%

Building 11

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 11

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Building 11

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING 11

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building 11

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING 2

Basement (if any)100%

Building 2

Excavation100%

BUILDING 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%

Building 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises45%

BUILDING 2

Plinth100%
Podiums (if any) 0%

Building 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 2

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Building 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building 2

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING 3

Basement (if any)100%

Building 3

Excavation100%

BUILDING 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%

Building 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%

BUILDING 3

Plinth100%
Podiums (if any) 0%

Building 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 3

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Building 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building 3

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING 4

Basement (if any)100%

Building 4

Excavation100%

BUILDING 4

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building 4

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 4

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building 4

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

BUILDING 4

Plinth100%
Podiums (if any) 0%

Building 4

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 4

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure15%

Building 4

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.10%

BUILDING 4

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%

Building 4

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure15%

BUILDING 5

Basement (if any)100%

Building 5

Excavation100%

BUILDING 5

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building 5

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 5

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%

Building 5

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Overall Percentage of Completion of the work done For the entire Building /Wing54%

BUILDING 5

Plinth100%
Podiums (if any) 0%

Building 5

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 5

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Building 5

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING 5

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building 5

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING 6

Basement (if any)100%

Building 6

Excavation100%

BUILDING 6

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building 6

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 6

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%

Building 6

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Overall Percentage of Completion of the work done For the entire Building /Wing54%

BUILDING 6

Plinth100%
Podiums (if any) 0%

Building 6

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 6

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Building 6

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING 6

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building 6

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING 7

Basement (if any)100%

Building 7

Excavation100%

BUILDING 7

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building 7

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 7

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building 7

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

BUILDING 7

Plinth100%
Podiums (if any) 0%

Building 7

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 7

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Building 7

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.25%

BUILDING 7

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%

Building 7

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING 8

Basement (if any)100%

Building 8

Excavation100%

BUILDING 8

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building 8

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 8

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%

Building 8

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises15%

BUILDING 8

Plinth100%
Podiums (if any) 0%

Building 8

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 8

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Building 8

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

BUILDING 8

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building 8

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING 9

Basement (if any)100%

Building 9

Excavation100%

BUILDING 9

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Building 9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 9

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Building 9

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing40%

BUILDING 9

Plinth100%
Podiums (if any) 0%

Building 9

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 9

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure90%

Building 9

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.10%

BUILDING 9

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%

Building 9

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure90%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Garden
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 2%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 8%
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.