RERA: A51800043517

Kashinath Patkar Nagar

by Om Developers
Kept in Abeyance P51700014748
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700014748
Registration No.
REA51700028562
Developer
Om Developers
Project Bank
GOPINATH PATIL PARSIK JANATA SAHAKARI BANK LIMITED
Proposed Possession
2019-12-31
Revised Possession
1900-01-01
Extended Possession
2022-12-31
Buildings
3
Project Area
2370.00 sq.m
Total FSI
2785.72
MahaRERA QR
Kashinath Patkar Nagar
MahaRERA — P51700014748
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking5
📅Completion2019-12-31
🅿️Closed Parking5
📅Completion2019-12-31
🅿️Closed Parking3
📅Completion2019-12-31

Apartment Configurations

A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.2 1 0 1
0%
1 BHK 34.84 3 1 2
33%
1 BHK 38.05 3 1 2
33%
1 BHK 38.18 3 2 1
67%
1 RK 24.21 3 0 3
0%
2 BHK 46.28 5 3 2
60%

B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 30.54 1 0 1
0%
1 BHK 34.85 4 0 4
0%
1 BHK 35.72 4 3 1
75%
1 BHK 38.18 4 0 4
0%
1 RK 22.96 3 0 3
0%
2 BHK 49.34 6 1 5
17%

C

Type Carpet (sq.ft) Total Booked Available Status
0 0 0 0
0%

Construction Progress

A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

C

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 80%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply 80%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.