📞 +91 98200 30685 ✉️
RERA: A51800043517

KHATRI GRANDE

by AASHIYANA BUILDERS ANDDEVELOPERS Partnership
Certificate Signed P51700008741
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700008741
Registration No.
REA51700015828
Registration Date
2017-08-19
Developer
AASHIYANA BUILDERS ANDDEVELOPERS Partnership
Architect
Raj Assocites Architect And Engineers
Project Bank
FEDERAL BANK
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
4364.76 sq.m
Total FSI
4364.76
Approved FSI
4364.76
MahaRERA QR
KHATRI GRANDE
MahaRERA — P51700008741
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
📅Completion2019-12-31
🏗️Proposed Floors8
Sanctioned8
📅Completion2019-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 27.649999618530273 0 0 0
0%
1 Bhk 27.899999618530273 0 0 0
0%
1 Bhk 28.110000610351562 0 0 0
0%
Shop 6.460000038146973 0 0 0
0%
Shop 7.289999961853027 0 0 0
0%
Shop 10.279999732971191 0 0 0
0%
Shop 10.819999694824219 0 0 0
0%
Shop 11.4399995803833 0 0 0
0%
Shop 11.640000343322754 0 0 0
0%
Shop 15.220000267028809 0 0 0
0%

Khatri Grande Building 8

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.65 14 11 3
79%
1 BHK 27.9 28 26 2
93%
1 BHK 28.11 14 11 3
79%
SHOP 6.46 2 2 0
100%
SHOP 7.29 1 0 1
0%
SHOP 10.28 2 2 0
100%
SHOP 10.82 2 2 0
100%
SHOP 11.44 2 1 1
50%
SHOP 11.64 1 1 0
100%
SHOP 15.22 4 2 2
50%

Khatrigrande Building 7

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.65 14 0 14
0%
1 BHK 27.9 28 1 27
4%
1 BHK 28.11 14 1 13
7%
SHOP 6.46 2 0 2
0%
SHOP 7.29 1 0 1
0%
SHOP 10.28 2 1 1
50%
SHOP 10.82 2 2 0
100%
SHOP 11.44 2 0 2
0%
SHOP 11.64 1 0 1
0%
SHOP 15.22 4 0 4
0%

Construction Progress

KHATRI GRANDE BUILDING 8

Basement (if any)100%

Khatri Grande Building 8

Excavation100%

KHATRI GRANDE BUILDING 8

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Khatri Grande Building 8

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

KHATRI GRANDE BUILDING 8

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Khatri Grande Building 8

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

KHATRI GRANDE BUILDING 8

Plinth100%
Podiums (if any) 0%

Khatri Grande Building 8

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

KHATRI GRANDE BUILDING 8

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Khatri Grande Building 8

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

KHATRI GRANDE BUILDING 8

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Khatri Grande Building 8

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

KHATRIGRANDE BUILDING 7

Basement (if any)100%

Khatrigrande Building 7

Excavation100%

KHATRIGRANDE BUILDING 7

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Khatrigrande Building 7

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

KHATRIGRANDE BUILDING 7

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Khatrigrande Building 7

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

KHATRIGRANDE BUILDING 7

Plinth100%
Podiums (if any) 0%

Khatrigrande Building 7

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

KHATRIGRANDE BUILDING 7

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure35%

Khatrigrande Building 7

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

KHATRIGRANDE BUILDING 7

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Khatrigrande Building 7

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure35%

RERA Registered Amenities

Aggregate area of recreational Open Space 50%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.