Project Information

RERA Certificate No.
P51700010400
Registration No.
REA51700015772
Registration Date
2017-08-24
Developer
ABHISHEK SHELTERS LTD Company
Architect
Pramod V Patil
Project Bank
IDBI BANK
Proposed Possession
2018-05-31
Revised Possession
2018-05-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
1780.75 sq.m
Total FSI
1780.75
Approved FSI
1780.75
MahaRERA QR
KOOL BREEZE PHASE II
MahaRERA — P51700010400
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
Sanctioned8
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 2Bhk Residentia 1780.75 0 0 0
0%

Kool Breeze Phase Ii

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 2 BHK RESIDENTIA 1780.75 0 20 -20
0%

Construction Progress

KOOL BREEZE PHASE II

Basement (if any)100%

Kool Breeze Phase Ii

Excavation100%

KOOL BREEZE PHASE II

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Kool Breeze Phase Ii

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

KOOL BREEZE PHASE II

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Kool Breeze Phase Ii

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing83%

KOOL BREEZE PHASE II

Plinth100%
Podiums (if any) 0%

Kool Breeze Phase Ii

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80%

KOOL BREEZE PHASE II

Sanitary Fittings within the flats / premises80%
Slabs of Super Structure100%

Kool Breeze Phase Ii

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

KOOL BREEZE PHASE II

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Kool Breeze Phase Ii

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 50%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements 50%
Landscaping & Tree Planting 10%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 50%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly