RERA: A51800043517

KRISHNA SQUARE

by GOPAL KRISHNA DEVELOPERS
Certificate Signed P51700013776
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700013776
Registration No.
REA51700024625
Registration Date
2021-09-09
Developer
GOPAL KRISHNA DEVELOPERS
Architect
Dilip Tambday And Associates
Project Bank
DCB BANK LIMITED
Proposed Possession
2023-07-31
Revised Possession
1900-01-01
Extended Possession
2026-07-30
Total Units
254
Units Sold
159 (63%)
Buildings
3
Project Area
3850.00 sq.m
Total FSI
9655.00
Approved FSI
2965.00
MahaRERA QR
KRISHNA SQUARE
MahaRERA — P51700013776
Scan to verify on MahaRERA portal

Wing-wise Details

⬇️Basements1
📅Completion2022-07-31
🅿️Closed Parking75
📅Completion2022-07-31
📅Completion2022-07-31

Apartment Configurations

Wing A

Type Carpet (sq.ft) Total Booked Available Status
SHOP 1 8.8 2 0 2
0%
SHOP 2 11.14 2 0 2
0%
SHOP 3 11.75 2 0 2
0%
SHOP10 18.45 12 0 12
0%
SHOP11 19.72 1 0 1
0%
SHOP12 19.89 2 0 2
0%
SHOP13 22.23 1 0 1
0%
SHOP14 22.41 1 0 1
0%
SHOP15 22.82 3 0 3
0%
SHOP16 23.64 2 0 2
0%
SHOP17 24.74 4 0 4
0%
SHOP18 24.86 5 0 5
0%
SHOP19 25.75 1 0 1
0%
SHOP20 26.48 1 0 1
0%
SHOP21 27.3 3 0 3
0%
SHOP22 29.94 1 0 1
0%
SHOP23 31.16 1 0 1
0%
SHOP24 31.64 1 0 1
0%
SHOP25 33.33 2 0 2
0%
SHOP26 36.98 1 0 1
0%
SHOP27 121.6 2 0 2
0%
SHOP4 12.64 3 0 3
0%
SHOP5 13.3 6 0 6
0%
SHOP6 14.73 1 0 1
0%
SHOP7 14.76 6 0 6
0%
SHOP9 17.55 4 0 4
0%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.45 26 13 13
50%
1 BHK 28.62 1 1 0
100%
1 BHK 29.7 26 26 0
100%
1 BHK 29.86 26 26 0
100%
1 BHK 29.96 26 26 0
100%
1 BHK 30.04 1 1 0
100%
1 BHK 30.14 1 1 0
100%
1 BHK 31.64 1 1 0
100%
2 BHK 11.74 1 0 1
0%
2 BHK 44.72 26 26 0
100%
2 BHK 46.82 1 0 1
0%
2 BHK 47.08 22 22 0
100%
3 BHK 11.14 1 0 1
0%
3 BHK 52.74 25 10 15
40%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
FIRST FLOOR 245.94 0 0 0
0%
FOURTH FLOOR 245.94 0 0 0
0%
GROUND FLOOR 26.12 0 0 0
0%
SECOND FLOOR 245.94 0 0 0
0%
THIRD FLOOR 245.94 0 0 0
0%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

WING A

Plinth100%
Podiums (if any) 0%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

WING B

Plinth100%
Podiums (if any) 100%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING C

Basement (if any)100%

Wing C

Excavation100%

WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing89%

WING C

Plinth100%
Podiums (if any) 0%

Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 90%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 90%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.