Project Information

RERA Certificate No.
P51700010195
Registration No.
REA51700013934
Registration Date
2017-08-24
Developer
LAABH BUILDTECH Partnership
Architect
Akruti Consultants
Project Bank
THE THANE BHARAT SAHAKARI BANK LIMITED
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
475.80 sq.m
Total FSI
1058.65
Approved FSI
1058.65
MahaRERA QR
LAABH NEELKANTH
MahaRERA — P51700010195
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Office 1 And 2 8.729999542236328 0 0 0
0%
Office F3 And S8 9.180000305175781 0 0 0
0%
Office F4 And S9 7.059999942779541 0 0 0
0%
Office F5 And S10 8.850000381469727 0 0 0
0%
Office F6 And S11 12.210000038146973 0 0 0
0%
Office F7 And S12 10.0600004196167 0 0 0
0%
Shop 1 76.69000244140625 0 0 0
0%
Type 1 32.540000915527344 0 0 0
0%
Type 1 154.52999877929688 0 0 0
0%
Type 10 22.809999465942383 0 0 0
0%
Type 11 12.420000076293945 0 0 0
0%
Type 12 13.859999656677246 0 0 0
0%
Type 13 16.209999084472656 0 0 0
0%
Type 2 28.0 0 0 0
0%
Type 3 31.690000534057617 0 0 0
0%
Type 3 32.869998931884766 0 0 0
0%
Type 4 29.1200008392334 0 0 0
0%
Type 5 35.099998474121094 0 0 0
0%
Type 6 26.920000076293945 0 0 0
0%
Type 7 16.190000534057617 0 0 0
0%
Type 8 16.190000534057617 0 0 0
0%
Type 9 25.209999084472656 0 0 0
0%

Building A

Type Carpet (sq.ft) Total Booked Available Status
OFFICE 1 AND 2 8.73 2 2 0
100%
OFFICE F3 AND S8 9.18 2 0 2
0%
OFFICE F4 AND S9 7.06 2 0 2
0%
OFFICE F5 AND S10 8.85 2 0 2
0%
OFFICE F6 AND S11 12.21 2 0 2
0%
OFFICE F7 AND S12 10.06 2 0 2
0%
SHOP 1 76.69 1 1 0
100%
TYPE 1 154.53 1 1 0
100%
TYPE 2 28.0 3 1 2
33%
TYPE 3 32.87 3 1 2
33%

Building A1

Type Carpet (sq.ft) Total Booked Available Status
TYPE 1 32.54 1 1 0
100%
TYPE 10 22.81 1 1 0
100%
TYPE 11 12.42 1 1 0
100%
TYPE 12 13.86 1 1 0
100%
TYPE 13 16.21 2 2 0
100%
TYPE 3 31.69 1 1 0
100%
TYPE 4 29.12 3 3 0
100%
TYPE 5 35.1 1 0 1
0%
TYPE 6 26.92 3 3 0
100%
TYPE 7 16.19 1 1 0
100%
TYPE 8 16.19 1 1 0
100%
TYPE 9 25.21 1 1 0
100%

Construction Progress

BUILDING A

Basement (if any)100%

Building A

Excavation100%

BUILDING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Building A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95%

BUILDING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Building A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%

BUILDING A

Plinth100%
Podiums (if any) 0%

Building A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%

BUILDING A

Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%

Building A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%

BUILDING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

Building A

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

BUILDING A1

Basement (if any)100%

Building A1

Excavation100%

BUILDING A1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Building A1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95%

BUILDING A1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%

Building A1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises95%
Overall Percentage of Completion of the work done For the entire Building /Wing87%

BUILDING A1

Plinth100%
Podiums (if any) 0%

Building A1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%

BUILDING A1

Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%

Building A1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%

BUILDING A1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

Building A1

Stilt Floor95%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 90%
Energy management 75%
Fire Protection And Fire Safety Requirements 50%
Landscaping & Tree Planting 75%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 95%
Solid Waste Management And Disposal
Storm Water Drains 95%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 75%
Water Supply 95%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.