MAPLE CITY PHASE I

by SHREE CHINTAMANI ENTERPRISES Partnership
Certificate Signed P51700009222
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700009222
Registration No.
REA51700018630
Registration Date
2021-09-09
Developer
SHREE CHINTAMANI ENTERPRISES Partnership
Architect
Satish Oak
Project Bank
STATE BANK OF INDIA
Proposed Possession
2021-12-30
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
6
Project Area
17040.00 sq.m
Total FSI
31521.98
Approved FSI
14524.54
MahaRERA QR
MAPLE CITY PHASE I
MahaRERA — P51700009222
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors9
Sanctioned9
📅Completion2020-12-31
🏗️Proposed Floors10
Sanctioned10
🅿️Closed Parking1
📅Completion2020-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2020-12-31
🏗️Proposed Floors9
Sanctioned9
🅿️Closed Parking1
📅Completion2020-12-31
🏗️Proposed Floors10
Sanctioned10
🅿️Closed Parking1
📅Completion2020-12-31
🏗️Proposed Floors10
Sanctioned10
🅿️Closed Parking1
📅Completion2020-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 26.329999923706055 0 0 0
0%
1 Bhk 26.6200008392334 0 0 0
0%
1 Bhk 26.649999618530273 0 0 0
0%
1 Bhk 26.809999465942383 0 0 0
0%
1 Bhk 26.84000015258789 0 0 0
0%
1 Bhk 27.290000915527344 0 0 0
0%
1 Bhk 27.399999618530273 0 0 0
0%
1 Bhk 27.670000076293945 0 0 0
0%
1 Bhk 27.780000686645508 0 0 0
0%
1 Bhk 27.790000915527344 0 0 0
0%
1 Bhk 27.979999542236328 0 0 0
0%
1 Bhk 28.100000381469727 0 0 0
0%
1 Bhk 28.110000610351562 0 0 0
0%
1 Bhk 28.139999389648438 0 0 0
0%
1 Bhk 28.170000076293945 0 0 0
0%
1 Bhk 28.18000030517578 0 0 0
0%
1 Bhk 28.469999313354492 0 0 0
0%
1 Bhk 28.479999542236328 0 0 0
0%
1 Bhk 28.6200008392334 0 0 0
0%
1 Bhk 28.899999618530273 0 0 0
0%
1 Bhk 29.34000015258789 0 0 0
0%
1 Bhk 29.799999237060547 0 0 0
0%
1 Bhk 29.899999618530273 0 0 0
0%
1 Bhk 30.200000762939453 0 0 0
0%
1 Bhk 30.290000915527344 0 0 0
0%
1 Bhk 30.40999984741211 0 0 0
0%
1 Bhk 31.059999465942383 0 0 0
0%
1 Bhk 31.3799991607666 0 0 0
0%
1 Bhk 31.389999389648438 0 0 0
0%
1 Bhk 31.43000030517578 0 0 0
0%
1 Bhk 31.459999084472656 0 0 0
0%
1 Bhk 31.600000381469727 0 0 0
0%
1 Bhk 31.75 0 0 0
0%
1 Bhk 31.760000228881836 0 0 0
0%
1 Bhk 31.8799991607666 0 0 0
0%
1 Bhk 32.0 0 0 0
0%
1 Bhk 32.02000045776367 0 0 0
0%
1 Bhk 32.06999969482422 0 0 0
0%
1 Bhk 32.189998626708984 0 0 0
0%
1 Bhk 32.66999816894531 0 0 0
0%
1 Bhk 32.75 0 0 0
0%
1 Bhk 32.869998931884766 0 0 0
0%
1 Bhk 32.97999954223633 0 0 0
0%
1 Bhk 33.040000915527344 0 0 0
0%
1 Bhk 39.790000915527344 0 0 0
0%
1Bhk 28.15999984741211 0 0 0
0%
2 Bhk 40.68000030517578 0 0 0
0%
2 Bhk 41.16999816894531 0 0 0
0%
2 Bhk 41.18000030517578 0 0 0
0%
2Bhk 40.68000030517578 0 0 0
0%
Shop 5.889999866485596 0 0 0
0%
Shop 8.550000190734863 0 0 0
0%
Shop 8.569999694824219 0 0 0
0%
Shop 8.770000457763672 0 0 0
0%
Shop 8.850000381469727 0 0 0
0%
Shop 8.989999771118164 0 0 0
0%
Shop 9.729999542236328 0 0 0
0%
Shop 9.75 0 0 0
0%
Shop 9.800000190734863 0 0 0
0%
Shop 9.9399995803833 0 0 0
0%
Shop 10.520000457763672 0 0 0
0%
Shop 10.600000381469727 0 0 0
0%
Shop 10.960000038146973 0 0 0
0%
Shop 11.59000015258789 0 0 0
0%
Shop 11.640000343322754 0 0 0
0%
Shop 11.970000267028809 0 0 0
0%
Shop 12.130000114440918 0 0 0
0%
Shop 12.550000190734863 0 0 0
0%
Shop 13.5 0 0 0
0%
Shop 14.279999732971191 0 0 0
0%
Shop 14.449999809265137 0 0 0
0%
Shop 16.1299991607666 0 0 0
0%
Shop 17.200000762939453 0 0 0
0%
Shop 21.079999923706055 0 0 0
0%

Maple City Building 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.33 1 0 1
0%
1 BHK 26.62 1 0 1
0%
1 BHK 26.65 1 0 1
0%
1 BHK 26.81 7 4 3
57%
1 BHK 26.84 7 5 2
71%
1 BHK 30.2 1 0 1
0%
1 BHK 30.41 1 0 1
0%
1 BHK 31.43 8 5 3
62%
1 BHK 31.6 8 3 5
38%
1 BHK 32.02 8 6 2
75%
1 BHK 32.19 8 5 3
62%
1 BHK 39.79 1 0 1
0%
2 BHK 40.68 1 0 1
0%
2 BHK 41.17 16 7 9
44%

Maple City Building 3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.18 8 4 4
50%
1 BHK 28.48 7 5 2
71%
1 BHK 29.34 1 0 1
0%
1 BHK 29.8 8 2 6
25%
1 BHK 30.29 8 3 5
38%
1 BHK 31.39 1 0 1
0%
1 BHK 32.02 8 4 4
50%
1 BHK 32.19 8 1 7
12%
2 BHK 40.68 1 0 1
0%
2 BHK 41.18 16 9 7
56%
SHOP 8.55 1 1 0
100%
SHOP 8.85 1 1 0
100%
SHOP 9.94 1 1 0
100%
SHOP 10.6 1 1 0
100%
SHOP 11.97 2 1 1
50%

Maple City Building 4

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.29 7 7 0
100%
1 BHK 27.78 4 4 0
100%
1 BHK 27.79 5 5 0
100%
1 BHK 28.1 3 3 0
100%
1 BHK 28.11 2 2 0
100%
1 BHK 31.06 7 7 0
100%
1 BHK 31.38 4 4 0
100%
1 BHK 31.46 10 10 0
100%
1 BHK 32.98 14 14 0
100%
SHOP 5.89 1 1 0
100%
SHOP 8.57 2 2 0
100%
SHOP 8.77 2 2 0
100%
SHOP 11.59 1 1 0
100%
SHOP 11.64 2 2 0
100%
SHOP 12.55 1 1 0
100%
SHOP 13.5 1 1 0
100%
SHOP 14.28 1 1 0
100%
SHOP 16.13 1 1 0
100%
SHOP 17.2 1 1 0
100%

Maple City Building 5

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.29 7 7 0
100%
1 BHK 27.67 1 1 0
100%
1 BHK 27.79 1 1 0
100%
1 BHK 27.98 6 5 1
83%
1 BHK 28.11 6 6 0
100%
1 BHK 31.06 7 7 0
100%
1 BHK 31.38 4 4 0
100%
1 BHK 31.46 10 10 0
100%
1 BHK 32.98 14 14 0
100%
SHOP 5.89 1 1 0
100%
SHOP 8.57 2 1 1
50%
SHOP 8.77 2 2 0
100%
SHOP 9.8 1 1 0
100%
SHOP 11.59 1 1 0
100%
SHOP 11.64 2 2 0
100%
SHOP 12.55 1 1 0
100%
SHOP 13.5 1 1 0
100%
SHOP 14.45 1 1 0
100%
SHOP 16.13 1 1 0
100%
SHOP 17.2 1 1 0
100%
SHOP 21.08 1 1 0
100%

Maple City Building 6

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 26.62 1 0 1
0%
1 BHK 26.65 1 0 1
0%
1 BHK 27.4 1 0 1
0%
1 BHK 28.14 7 7 0
100%
1 BHK 28.16 7 7 0
100%
1 BHK 31.43 1 1 0
100%
1 BHK 31.6 1 0 1
0%
1 BHK 31.76 1 0 1
0%
1 BHK 31.88 7 5 2
71%
1 BHK 32.0 4 4 0
100%
1 BHK 32.02 1 0 1
0%
1 BHK 32.67 7 6 1
86%
1 BHK 32.87 3 3 0
100%
1 BHK 33.04 7 7 0
100%
SHOP 8.99 1 1 0
100%
SHOP 9.73 1 1 0
100%
SHOP 9.75 1 1 0
100%
SHOP 10.52 1 1 0
100%
SHOP 10.96 1 1 0
100%
SHOP 12.13 1 1 0
100%

Maple City Building 7

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 28.17 1 1 0
100%
1 BHK 28.47 2 0 2
0%
1 BHK 28.62 8 6 2
75%
1 BHK 28.9 14 12 2
86%
1 BHK 29.9 1 0 1
0%
1 BHK 31.75 16 12 4
75%
1 BHK 31.88 1 0 1
0%
1 BHK 32.07 8 4 4
50%
1 BHK 32.75 16 9 7
56%

Construction Progress

MAPLE CITY BUILDING 2

Basement (if any)100%

Maple City Building 2

Excavation100%

MAPLE CITY BUILDING 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Maple City Building 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MAPLE CITY BUILDING 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Maple City Building 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

MAPLE CITY BUILDING 2

Plinth100%
Podiums (if any) 0%

Maple City Building 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

MAPLE CITY BUILDING 2

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Maple City Building 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MAPLE CITY BUILDING 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Maple City Building 2

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MAPLE CITY BUILDING 3

Basement (if any)100%

Maple City Building 3

Excavation100%

MAPLE CITY BUILDING 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Maple City Building 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MAPLE CITY BUILDING 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Maple City Building 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

MAPLE CITY BUILDING 3

Plinth100%
Podiums (if any) 0%

Maple City Building 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

MAPLE CITY BUILDING 3

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Maple City Building 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MAPLE CITY BUILDING 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Maple City Building 3

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MAPLE CITY BUILDING 4

Basement (if any)100%

Maple City Building 4

Excavation100%

MAPLE CITY BUILDING 4

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Maple City Building 4

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

MAPLE CITY BUILDING 4

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Maple City Building 4

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing78%

MAPLE CITY BUILDING 4

Plinth100%
Podiums (if any) 0%

Maple City Building 4

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80%

MAPLE CITY BUILDING 4

Sanitary Fittings within the flats / premises80%
Slabs of Super Structure100%

Maple City Building 4

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MAPLE CITY BUILDING 4

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Maple City Building 4

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MAPLE CITY BUILDING 5

Basement (if any)100%

Maple City Building 5

Excavation100%

MAPLE CITY BUILDING 5

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Maple City Building 5

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

MAPLE CITY BUILDING 5

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Maple City Building 5

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing78%

MAPLE CITY BUILDING 5

Plinth100%
Podiums (if any) 0%

Maple City Building 5

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises80%

MAPLE CITY BUILDING 5

Sanitary Fittings within the flats / premises80%
Slabs of Super Structure100%

Maple City Building 5

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

MAPLE CITY BUILDING 5

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Maple City Building 5

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MAPLE CITY BUILDING 6

Basement (if any)100%

Maple City Building 6

Excavation100%

MAPLE CITY BUILDING 6

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%

Maple City Building 6

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MAPLE CITY BUILDING 6

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Maple City Building 6

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing52%

MAPLE CITY BUILDING 6

Plinth100%
Podiums (if any) 0%

Maple City Building 6

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

MAPLE CITY BUILDING 6

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Maple City Building 6

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%

MAPLE CITY BUILDING 6

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%

Maple City Building 6

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

MAPLE CITY BUILDING 7

Basement (if any)100%

Maple City Building 7

Excavation100%

MAPLE CITY BUILDING 7

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%

Maple City Building 7

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

MAPLE CITY BUILDING 7

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%

Maple City Building 7

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises70%
Overall Percentage of Completion of the work done For the entire Building /Wing49%

MAPLE CITY BUILDING 7

Plinth100%
Podiums (if any) 0%

Maple City Building 7

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

MAPLE CITY BUILDING 7

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Maple City Building 7

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.70%

MAPLE CITY BUILDING 7

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%

Maple City Building 7

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.